<br />In the response, the applicant did not provide the specific comparison of approved vs. existing as built <br />typical cross-sections for CRDA-I and CRDA-2 as requested. Cross sections were provided only for <br />CRDA-1(apparently existing cross sections), but no cross sections were provided for CRDA-2. <br />Explanation will need to be provided. Unless adequate justification is provided, approved and as built <br />cross sections will need to be submitted for the reclaimed benches of both CRDA-I and CRDA-2, if the <br />operator chooses to pursue Phase I bond release request for CRDA-1 and CRDA-2 reclaimed benches. <br />In addition, the Division requested the operator to document proper completion ofunderdrain installation, <br />piezometric monitoring, construction and compaction compliance, stability, drainage/sediment control, and <br />perimeter ditch and upland diversion construction and functioning. In response, the operator submitted the <br />following information: <br />• Excerpts from DMG inspection reports of June 29, 1994 and June 8, 1995 were submitted to <br />document verification of adequate cover soil replacement. <br />• Regarding underdrains, the operator submitted correspondence from 1983, and a Division <br />inspection report from March, 1982, indicating that CRDA-I underdrains had been <br />completed, and appeared to be functioning properly. Apparently, installation of the <br />underdrain was completed in 1981, but the installation was not certified by aP.E., and an <br />NOV was issued by DMG in 1993. Underdrains were not requved for CRDA-2. <br />• Operator referenced quarterly piezometric data contained in annual hydrologic reports, to <br />document compliance withpiezometric monitoring requirements. The monitoring data does <br />document compliance with permit requirements. <br />• Regarding compaction compliance, the operator's response referenced quarterly construction <br />certifications and compaction reports, which are on file at the mine office and DMG offices. <br />The certification reports document that construction was conducted in accordance with the <br />approved design. <br />• Regarding stability of the pile, the operator references stability analysis assumptions for both <br />piles, and indicates that, based on the "as built final slopes" depicted on [he bond release map, <br />the piles exceed the safety factor requrements of the permit and regulations. <br />• Regarding the perimeter ditches at CRDA-I and CRDA-2, and the upland diversion ditch at <br />CRDA-2, the operator states that the ditches have performed as designed and with very little <br />maintenance. <br />DMG and OSM conducted an intensive "special focus inspection" on August 5 through August 8, 1997 to <br />evaluate compliance of refuse pile construction and reclamation with permit requirements. The lower <br />benches of each CRDA pile for which Phase I bond release is now being requested, had been final graded, <br />cover soiled and revegetated prior to that inspection (cover soiled and seeded in 1994). The DMG <br />inspection report was issued on August 29, 1997, and afollow-up addendum with additional documentation <br />of slope and terrace drain compliance evaluation, piezometric evaluation, and ditch design evaluation was <br />completed on October 17, 1997. The August 29, 1997 report describes the inspection procedure as follows: <br />The special focus inspection involved review of records associated with the refuse areas, <br />including quarterly operator inspection reports/construction certifications, compaction <br />reports, ptezometer monitoring records, stability analyses, and DMG refuse cover <br />replacement documentation. Historical records were reviewed a[ the DMG mine offices, <br />previous quarter records were reviewed at the PCC mine office. <br />Field inspection included general assessment of active operations and reclaimed slopes <br />at each refuse area, with respect to permit compliance, apparent stability, excessive <br />erosion, vegetation establishment, and maintenance ofsurface wafer drainage controls. <br />/n addition, field measurements using an abney level, 300 foot rape, and [ape measure <br />>r~ere made 1o checkk apparen! compliance with permit specifications for final reclaim <br />slope gradients; terrace drain spacing, slope and dimension; diverston/collec(ion ditch <br />dimension, shape, and gradient; and culvert si=ing. <br />