Laserfiche WebLink
~SrE~ <br />~~r~ttt <br />- wc. <br />_ _ A Subsuliap~ <br />of <br />Wec(ent Fuels <br />Acvleialia:. lnc. <br />Ms. Barbara Pavlik <br />Reclamation Specialist <br />Office of Mined land Reclamation <br />Division of Minerals & Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 80202 <br />iii iiiiuiiiiiiiiii <br />999 <br />February 1, 1995 ;-i~CEIVED <br />FEB 0 3 1995 <br />Oivi;, ~ of minerals & Geology <br />RE: MINOR REVISION TO INSTALL A 12" CULVERT <br />DESERADO MINE C-81-018 <br />Dear Ms. Pavlik: <br />Western Fuels-Utah hereby requests DMG's approval to install a 12-inch culvert at the eastern <br />entrance of RP-5A. The culvert will allow runoff from the haul road ditch to pass the entrance <br />without running down the pit road and be picked up by the East ditch of RP-5A. <br />Map 77A has been revised to show the location of the culvert. Three copies of Map 77A and <br />SEDCAD calculations are enclosed. SEDCAD calculations should be inserted at the end of <br />Illustration 44. Three copies of revised Illustration 44 title page are also enclosed. <br />No additional area will be disturbed since the culvert will be installed in an already disturbed area. <br />However, additional expense may be incurred to remove the culvert during post-mining <br />reclamation. WFU has adequate bond cushion to cover this cost. Please provide us with DMG's <br />estimate of this cost so the bond cushion can be adjusted accordingly. <br />A tally completed revision form is enclosed. <br />If you have any questions, please call. <br />Sincerely, ~ /~~ <br />~~1/lti~.-~ ~ V v ~ <br />Murari P. Shrestha, P.E. <br />Assistant Manager of Engineering <br />MS:Igp <br />cc: Bob Hagen, OSMRE -Albuquerque <br />Mr. Curt Smith, BLM-Meeker <br />Richard Holbrook, OSMRE -Denver <br />Jeff Dubbert, WFU <br />Suite #i05 <br />405 Urban Street <br />lakewood, Colorado 80228 <br />Telephone 30;/988-962(1 <br />Telecopier 303/986-8147 <br />