Laserfiche WebLink
<br />Reclamation costs for this maximum area are based on the following <br />data: <br />PER ACRE <br />1. Backfill and reshaping, 4 hrs @ $50/hr $200.00 <br />2. Final grading or ripping, 5 hrs @ $50/hr 250.00 <br />3. Grass seed mixture, 21.6 lbs/acre @ $5 180.00 <br />Fertilizer based on soil test deficiencies 20.00 <br />Mulch 65.00 <br />Labor, 16 man hrs/acre @ $6/hr 96.00 <br />289.00 <br />4. Seed mixture drilling or broadcasting and <br />fertilizing, 2.5 hrs @ $40/hr 100.00 <br />5. Trees and shrubs, 240.00 <br />Labor, 8 man-hrs/acre @ $6/hr 48.00 <br />388.00 <br />Thus, reclamation costs for the combined acreage are as follows: <br />1. Backfill and reshaping, 14.75 acres X $200/acre <br />2. Final grading and/or ripping, 20.81 acres X $250/acre <br />3. Revegetation - grass mixture, trees, fertilizer, <br />mulch, labor 20.81 acres X $289/acre <br />4. Seed mixture drill or broadcast and fertilizing <br />20.81 acres X $100/acre <br />5. Trees and Labor, 20.81 acres X $388/acre <br />We recommend that bond be set at $25,000. <br />$2,950.00 <br />5,202.50 <br />6,614.09 <br />2,081.00 <br />8,074.28 <br />$24,921.87 <br /> <br />