Laserfiche WebLink
RECLAMATION COSTS <br />Exhibit L <br />Reclamation Costs <br />On the following pages are calculations for the reclamation cost. The totals are contained in the first block on <br />the first page. The calculations that produced the totals are in the subsequent blocks. <br />The estimated reclamation cost is calculated to be $116,051.54. <br />Preliminary recommended bond amount for this operation is $116,051.54 <br />(NOTE: The amount NOW include the various add-ons for move in, contractor fees, and <br />Division of Minerals and Geology administrative fees. Please see spreadsheet printout which follows) <br />THESE RECLAMATION COSTS ONLY INCLUDE AREAS <br />A AND B. THEY DO NOT INCLUDE ANY DISTURBANCES <br />IN AREA C. <br />PRIOR TO DISTURBING ANY LAND IN AREA C, <br />SUITABLE BOND MUST BE SUBMITTED AND <br />APPROVED BY THE DIVISION. <br />Table Mountain Quarry -Castle Concrete Company Exhibit L (Amendment 1) Page 1 <br />