My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-26_REVISION - M1997065
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997065
>
2007-09-26_REVISION - M1997065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:05:59 PM
Creation date
11/22/2007 1:25:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997065
IBM Index Class Name
Revision
Doc Date
9/26/2007
Doc Name
Cost summary form
From
Brownstone Quarry
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatintt Software <br />PROJECT IDENTIFICATION <br />Task # : 004 <br />Date : 09/26/2007 <br />User : ESC <br />State :Colorado <br />Counly : Ladmer <br />Site :Brownstone Quarry <br />PermiUjob # : M-1997-065 <br />Abbreviation :none <br />Filename : M065-004 <br />Agency or organization name :DRMS <br />Permit or other job action : CNA1 <br />Task description :Rip S <br />HOURLY EQUIPMENT COST <br />Area <br />Basic machine :Cat D8R Series 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Utilization <br />Cost Breakdown : Ownership costlhour : $57.41 NA <br />Dozer operating cost/hour : $43.87 100 <br />Ripper operating cost/hour : $5.01 75 <br />Operator cost/hour : $32.78 NA <br />Total unit cosUhour : $139.07 Total fleet cost/hour : $139.07 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 2.00 acres Rip depth (ft) : 3.00 Volume : 9,880 BCY or CCY <br />Source of estimated quantity :DRMS Estimate <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feeUsecond <br />Unadjusted production : NA cu. yds./hour <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />Unadjusted production <br />JOB TIME AND COST <br />Fleet size <br />2.56 feeUpass <br />7.08 feeUpass <br />50.00 feeUpass <br />88.00 feeUminute <br />025 minutes/pass <br />0.596 acres/hour <br />2,461.39 cu. yds.lhour <br />1 dozers) <br />Unit cost : '$0.068 per cu. yd. <br />Unadjusted production <br />per selected method : 2,461.39 cu. yds./hour <br />Site altitude : 5,400 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shiH/day) <br />Net job correction : 0.83 muNiplier <br /> <br />Adjusted unit production : 2,042.96 cu. yds./hour <br />Adjusted fleet production : 2,042.98 cu. yds./hour <br />Total job time : 4.74 hours <br />Total job cost : $659 <br />
The URL can be used to link to this page
Your browser does not support the video tag.