My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-26_REVISION - M1997065
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997065
>
2007-09-26_REVISION - M1997065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:05:59 PM
Creation date
11/22/2007 1:25:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997065
IBM Index Class Name
Revision
Doc Date
9/26/2007
Doc Name
Cost summary form
From
Brownstone Quarry
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />sheet 1 of 2 <br />Agency or organization name : DRMS <br />Task#: 002 State :Colorado Pennitlob#:M•1997-085 <br />Date : 09/Zfi/2007 County : Ladmer Abbreviation :none <br />User : ESC Site :Brownstone Quarry Filename : MO6S002 <br />Permit or other job action : CN-01 <br />Task description :Haul Upper Overburden Pile Into Plt 8 Grade <br />,: <br />,: <br />HOURLY EQUIPMENT COST Shlff basis : 1 per day <br />team <br />Support equipment -Load area : NA <br />-Dump area :Cat D8R Series ll - 8SU <br />Road maintenance -Motor grader : NA <br />-Water truck :~A <br />Cost Breakdown : mcWLoader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA dozer NA NA <br />Utilization-machine : 100 92 NA 50 NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership cosUhour: $14.80 $21.07 NA $50.32 NA NA <br />Operating cosUhour : $46.23 $28.37 NA $38.56 NA NA <br />Ripper op. cost/hour : NA NA NA $0.00 NA NA <br />Operator cest/hour : $24.14 $32.78 NA $32.78 NA NA <br />Unit subtotals : $85.18 $82.22 NA $121.66 NA NA <br />Number of units : 4 2 0 1 0 0 <br />Group subtotals : Work : $505.14 Support : $121.66 Maintenance : $0.00 <br />Total work team cesVhour : $628.80 <br />MATERIAL QUANTITIES <br />IniBal Swell Loose <br />volume : 191,852 LCY factor : NA volume : 191,852 LCY <br />Source of quantity takeoff :Operator Estimate <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY Total cost : SO <br />:: ;::: <br /> <br />HOURLY PRODUCTION <br /><...;:.. :. <br />Truck Caoacily <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,900 pounds/LCY Stack volume : 12.00 LCY <br />Descr.: Decomposed rock - 50% Rock, 50% Earth Heaped volume : 18.00 LCY <br />Rated payload : 50,300 pounds Average volume : 15.00 LCY <br />Payload capacity : 17.34 LCY Adjusted volume': 17.34 LCY <br />Final truck volume based on number of loader passes : 16.41 LCY <br />• tack volume adlusted to not exce ed rateo payload or heaped volume <br />Loading tool Caoacily : ob Condition Corrections : Site altitude (ft.) : 5 <br />Rated capacity (nom. heaped) : 3.750 LCY Truck Loader S~ <br />Descr.: Loose material - 1"and over (85 - 90%) Altitude adj.: 1.000 1.000 (C <br />Bucket f ll factor : 0.875 Job effciency : 0.830 0.830 (1 sk <br />Adjusted bucket capacity : 3.281 LCY Net conection : 0.830 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.