My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV105343
DRMS
>
Back File Migration
>
Revision
>
REV105343
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:17:00 AM
Creation date
11/22/2007 1:25:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
4/16/1992
Doc Name
PERMIT C-81-019 PR-01/PERMIT RENEWAL SUPPLEMENTAL INFORMATION
From
COLOWYO COAL CO
To
MLRD
Type & Sequence
PR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r ~ • <br />Revised March, 1992 <br />• RECLAMATION PLAN <br />The final configuration of the fill is designed to minimize <br />erosion. The final configuration takes into account a number of <br />the components of the Streeter Fill reclamation which have proven <br />successful. The final outslope will not exceed 3h:ly. Drainage <br />benches of at least a 12 foot width will be constructed at <br />approximately 100 foot vertical increments. These drainage benches <br />will direct surface runoff to the west into a permanent drainage <br />channel designed to pass safely the runoff from a 100 year, 24 hour <br />precipitation event. See the attached Exhibit 19 II-b, Section 16 <br />Fill Design for complete details regarding the proposed <br />construction of the fill. <br />Reclamation, specifically topsoil replacement, seeding etc. <br />will be implemented consistent with the Section 2.05 of the permit <br />which have proven to be successful on Streeter Fill and other <br />reclaimed areas at Colowyo. <br />INSPECTION PLAN <br />During construction of the Section 16 Fill, Colowyo will <br />provide the following information in certified reports as required <br />by Rule 4.09.1(11). <br />• 1. Prior to construction of the fill the existence of <br />shallow bedrock at the toe of the fill will be documented <br />and certified by a registered Engineer. The Division <br />will be notified should the further investigation of the <br />toe area indicate conditions other than shallow bedrock. <br />Appropriate alternative analysis and recommendations will <br />then be completed by CTLiThompson and implemented by <br />Colowyo prior to construction of the fill. Any amended <br />design will be submitted to the Division for its review <br />and approval, prior to construction of the Section 16 <br />Fill. <br />2. Inspections will be conducted at least quarterly during <br />the construction period and during the following specific <br />construction periods. <br />a. removal of topsoil and organic material <br />b. placement of underdrain system <br />c. installation of surface drain system <br />d. placement of fill material to insure that the <br />largest rocks are reaching the bottom of the dump <br />face and that the formation of voids that adversely <br />affect mass stability are prevented and <br />e. revegetation <br />• <br />II a-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.