Laserfiche WebLink
<br />r ~ <br />'~. <br />Pnnd A Araa <br /> <br />1) The drainage at the Pond A fill site will be handled as part of the <br />permanent drainage system (see Soil Stabilization Plan Permit Renewal pg <br />780-129-1 and or Technical Revision 87-14). All construction, maintenance <br />and repair applicable to permanent channels will apply. A rocked grade <br />crossing is proposed for the permanent road passage. <br />2) The 78 inch culvert at the Pond A fill site will be crushed and buried <br />similar to the one at the Area 41 fill site. The culvert will be crushed <br />and covered sufficiently so that it does not affect the postmining <br />topography. <br />Other Areas <br />1) Map TR 87-12-3 has been revised to show the reclaimed roads will not <br />exceed 20 feet in width. <br />2) Map 7R 87-12-3 shows a typical cross section for reclamation of cut and <br />fill areas. Drainages will be reclaimed as discussed in the previous <br />referenced Soil Stabilization Plan and as shown on postmining topography. <br />Drainage crossings will be accomplished by installing appropriately sized <br />culverts as shown on Map TR 87-12-I and TR 87-12-2 or rocked grade crossings. <br />Revised Pages <br />1) Mulching is no longer required at CYCC (see minor revision approved hiay <br />16, 1985 and Permit Renewal page 780-II7-1). <br />Page 780-118x, Table TR 87-12-I, and Map TR 87-12-3 have been revised <br />to reflect these changes and are included. <br />If there are questions, please contact me. <br />Sincerely, <br />~, .. <br />,w6B-v~~ <br />errell K: Johnson <br />Environme ,tai Specialist <br />TKJ/dg <br />Enclosures <br />