Laserfiche WebLink
<br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />DePanment of Natural Resources <br />1313 Sherman Sl.. Room 21 S <br />Denver, Colorado 80203 <br />Phone: !3031886.3567 <br />FAX: 13031832-8106 APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />DEPARTMENT' O <br />NATURAI <br />RESOURCE <br />This form must be completed and submitted with all requests for minor revisions, as defined in Roy Romer <br />Rule 1.04173), technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined cO1"tOr <br />in Rule 1.04(90). All revisions are to address the requirements of Rule 2.08.4. Three (3) copies ~ K o ma <br />of the revision, including maps, must be submitted in order for it to be complete. <br />Michael B. Long <br />Divifion Director <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised <br />sections, maps, tables and/or figures, with a revised table of contents, if necessary. The revision submittal <br />date should be printed in the lower right corner of each revision page. A cover letter to the revision should <br />explain the nature of the revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing <br />list at the same time the application is submitted to the Division, and proof of distribution must be submitted <br />to the Division along with the application. Copies of revision pages modified during the review process must <br />be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. For rion-federal mines, a copy of the application for which the <br />Division has issued a proposed approval decision must be submitted to the OSM Western Regional <br />Coordinating Center (1999 Broadway Blvd., Suite 3320, Denver, CO 80202-5733), and proof of submittal <br />to OSM must be submitted to the Division prior to implementation of the revision. <br />Permit No.: C- 8 1_ 0 1 9 Date: 0 8/ 2 0/ 9 7 ~~6~)\/t= ~ <br />Permittee: C 0. L O W Y 0 C O A L <br />-^ --- - -- ------- AUG281997 <br />C 0 <br />- - M P A <br />- - - N <br />- Y <br />- - L. P. <br />- - - - - - - <br />Street: 5 7 3 I _ ~, Z .~ Z ~ _ _ _ _ _ pivision of fulmCrals r~ ucv~ugy <br />~i~ Sz~~+L ~ ~_ ~3----- <br />City; M E E K E R _ _ _ _ _ _ _ _ _ <br />State: C 0 Zip Code: 8 1 6 4 1-____ <br />Brief Description of Revision: A D D I T I 0 N A L <br /> S M A L L D E P R E S S <br /> I 0 N S / S S 0 C K P Q ~L ~ S <br />Public Notice Attached: Yes _ No x (Required for PRs and TRsJ <br />Bond Increase: Yes Na x Federal x Non-Federal Mine <br />Proposed Change in: <br />Disturbed Area (+/-) _ _ ~ _ Acres Affected Area (+/-- _ _ 0 . _ Acres <br />Permit Area (+/-) _ _ ~ _ Acres Federal Land (+/-) _ _ ~ _ Acres <br />State Land (+/-) _ _ _p_, . _ Acres Private Land (+/-) _ _ 0 . _ Acres <br />m:lcoal\share\f orms\8865 <br />