My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-10-14_REVISION - M1992069
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992069
>
2003-10-14_REVISION - M1992069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:47 PM
Creation date
11/22/2007 1:24:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992069
IBM Index Class Name
Revision
Doc Date
10/14/2003
Doc Name
Concept Phase Report
From
Applegate
To
DMG
Type & Sequence
TR5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North Eogk:via. Drairmge Concept Phase <br />Carxept fka°-A/ferroie3sile(/cokin9nalfiJ <br />5/was cy~proxierazie exirnt of n~sv spi/May in Pond dmik <br />The next page cantons a perspective view of the proposed Eoglevwr Pad spilhvay token from neor the same <br />viewpo'art os the photo above but from a'bird's eye' elevation. The schematic shows the proposed spilhwry charnel <br />and fhmte aver the #3 Ditch The upstneom ad of the #3 Ditch caxrete box advert fkav control sinxture is just <br />visible between ibe #3 weir and the proposed pad spilhvay. <br />The sketch shows the auvsete celluka• mattress armor in the bottom of each channel and the segmental block <br />retanvg walls which will be used to line the sides of the #3 Ditch spillway charwJ ad the pord spillway charnel and <br />fhane <br />Page 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.