My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-10-14_REVISION - M1992069
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992069
>
2003-10-14_REVISION - M1992069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:47 PM
Creation date
11/22/2007 1:24:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992069
IBM Index Class Name
Revision
Doc Date
10/14/2003
Doc Name
Concept Phase Report
From
Applegate
To
DMG
Type & Sequence
TR5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North Eagkvier Drain4e Concept Phase <br />COST ESTIMATE: <br />ALTERI~IATE 1- ARMOR EJQSTIIJ6 EA6LEVIEW POND 59B1-WAY AND BIJL.D 300' LONFi #3 DITCH WEIR <br />The follarig tobk prr~mts ar estimate of constrvctim cost for this otterviate The tabk cantons an allarance <br />of 20% for unforeseen or uriawwr corrtingarcies since the estimate is bored m wrcephial studies ardy. Future <br />estimates based an f'snol design plans will be more exact and call reduce that allorornce accadirr~y_ <br />Item Description Quordity lhrts Unit Price Total Price <br />i Ckar 3 6rvb rightof+cy 34,000 SY 5O.5o 517,000.00 <br />2 Remove tress a EA 5600.00 52,000.00 <br />3 Bereave boric cast fence 400 LF 52.50 51,000.00 <br />4 Dispose of onsite debris 1 IS 54,000.00 54,000-00 <br />5 Sawdrt asghaM pavement F St 50 LF 55.00 5250.00 <br />6 Remove asphak pnvcment F St 14 SY 510-00 5140.00 <br />7 Sik fence 1,600 LF 51.50 52,400.00 <br />8 Excawtion for drw.~cl 19,000 CY 53.50 566,500.00 <br />9 Embankment for charnel 1,000 CY 52.00 52,000.00 <br />10 Drop stnreturs (atoff calk) in dae.ml 2 EA f 3,000.00 56,000.00 <br />tl Fkwr control structue in #3 DMdr 1 EA f 15,000.00 515,000.00 <br />12 Conu~ete Box Culvert (3~'x 10') 90 lF 51,200.00 5108,000-00 <br />13 Concrete txllukr mattress 60,600 SF 57.00 (424,200.00 <br />14 6eotextik fabric under mattress 60,600 SF 50.50 530,300.00 <br />15 Aggregate Banc Course lOD Tm 525-00 52,500.00 <br />16 Hot BltumingLS Pavement 50 Ton 5100.00 55,000.00 <br />17 Striping center5rw 70 $F 55.00 (350.00 <br />18 Topsoil 30,060 SY 51.00 530,060.00 <br />19 Reseed 30,060 SY 50.50 515,030.00 <br />20 Traffic Cortrol signs, Pancl A 8 EA 5120.00 5960.00 <br />21 Drum C'homclizig Device 20 EA 550.00 51,000.00 <br />22 Traffic Control Mamguxcnt 30 Days 5400.00 512,000.00 <br />23 Traffic Control Inspection 30 Days (100.00 53,000.00 <br />24 Fkggcrs 100 1-Fs 525.00 52,500.00 <br />25 Adjust calve box r/coot ring 2 EA f50O.OD 51,000.00 <br />26 Adjust monhok r/coot ring 6 l.5 f 500.00 53,000.00 <br />27 Constivct barb wire fens 2,800 LF 55.00 514,000.00 <br /> Estimated cortttnrctiarn cost 5769,190.00 <br /> Corrtingrncy 6 uicnowa 20% 5154,000.00 <br /> Prabobk total oonsfruction cast 5923,190.00 <br /> Ergineerirg Design b Constnrcton service 20% 5184,600.00 <br /> Lard 8 easements 5126,000.00 <br /> Prababk totd project cost Aherrote 1 say 51,234,000.00 <br />Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.