My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-10-14_REVISION - M1992069
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992069
>
2003-10-14_REVISION - M1992069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:47 PM
Creation date
11/22/2007 1:24:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992069
IBM Index Class Name
Revision
Doc Date
10/14/2003
Doc Name
Concept Phase Report
From
Applegate
To
DMG
Type & Sequence
TR5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North Eo_gkvkw Dr~cnge Concept PFnse <br />COSTDI~FE7PEM'f'ESTIMA7F-CA4~-T ~iVO" <br />The akanates of this Concept were anolyad ad modeled 9rffidently to dlow sing of the principd components <br />Cost estimates of the differares between The two olttroates wu+e prcpaed fo dlow canporisan os shorn n the <br />followig tabk. <br />Item Description Quantity lhits Unit Price Total Price <br />New Regiard Pad / smaAl Bum chomd <br />1 Ckm• 6 6nb rightofaay 65,100 SY 50.50 532,550.00 <br />2 Excawtion far chapel 4 pond 75,000 CY 53.50 5262 500.00 <br />3 Embaicment far drmrml 4 pad 7,700 CY 54.OD 530,600.00 <br />4 Drop stracfires (atoff walk) k chapel 1 EA 53,000.00 53,000.00 <br />5 Concrete Box Cuhr~-t F 5t (1- 3'x 7') 90 LF 5500.00 545,000.00 <br />6 Conmete celWlor mattress 200 SF 57.00 51,400.00 <br />7 6eotextik fabric under mathcss 200 SF 5050 SI00.00 <br />6 Topsoil 6500 SY 51.00 56500.00 <br />9 Rested 65J00 SY 50.50 532,550.00 <br /> Estimated construction cosy 5473,000.00 <br /> CoMirguw.y 6 unkrown 20% 595,000.00 <br /> Prx'drose right-of-way 5180,000.00 <br /> Robabk total cost 5748,000.00 <br /> <br />Gravel Pit / b'9e Bttm chatnrJ <br />1 Ckor 4 6nib rightof-way 23 300 SY SO-50 SII,650.00 <br />2 Excnvntion fa• chamel4 pond 15,600 CY 53.50 555,300.00 <br />3 Embarirreent for drmrrel 4 pond 20 CY 54.00 580.00 <br />4 Drop structures (cutoff calls) in ~I 2 EA 53,000.00 56,000.00 <br />5 Carcrete Box Culvert F 5t (3 - 4'x 10') 90 l.F 51,200.00 5108,000.00 <br />b Corraete a:llukr mattress 400 SF 57.00 52,800.00 <br />7 6eotextik fabric order mattrrss 400 SF 5050 5200.00 <br />8 Topsoil - 23300 SY 5!_00 523,300.00 <br />9 Reseed 23 300 SY 5050 511,650.00 <br /> Estimated rnrn:tnrction cost 5218980.00 <br /> Contiergeay 4 uikrown 20$ 544.000-00 <br /> Praelrose right~af-way 4 easement 5142,000.00 <br /> Probobk total rnrrstruction cunt soy 5~,~-~ <br />Appazsrt dtffa~ese in tact <br />New Regiaml Pad / small cha.wl <br />Gravel Pit / krge chmrrel <br />difference <br />5748,000.00 <br />5405,000.00 <br />5343.000.00 <br />Page tl <br />
The URL can be used to link to this page
Your browser does not support the video tag.