My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV105126
DRMS
>
Back File Migration
>
Revision
>
REV105126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:16:41 AM
Creation date
11/22/2007 1:23:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
Revision
Doc Date
2/20/2003
Doc Name
Letter & Application
From
American Canopy & Equipment
To
DMG
Type & Sequence
TR16
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMERICAN CANOPY & EQUIPMENT <br />Awning-Energy Savers and Instant Shade <br />106 N 8`s Street <br />Silt, CO 81652 <br />February 14, 2003 <br />Byron Walker, Environmental Protection Specialist <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Deaz Mr. Walker: <br />M ~ 30 <br />Telephone (970)-876-5368 <br />Fax: (970)876-5234 <br />REC~IV ~D <br />FE6 2 0 2003 <br />pivision of Minerals and Geofog'{ <br />Attached is a revision for the Eastside Mine Permit, Permit No C-194-063. Section 2.05(4) is being <br />revised to show the extent of the existing reclamation and removal of the Rill and Gullying monitoring <br />requirement. <br />The following list gives the pages revised and the paragraphs revised. <br />Page 90 Paragraph 3-regrading of the sediment pond and removal and non renewal of the <br />NPDES permit for the Eastside Mine. <br />Paragraph 5-Clarification of text. <br />Paragraph 6-Clarification of method of measurement of water surface elevation. <br />Paragraph 7-Removal of the annual spring and seep survey requirement. <br />Paragraph 9-Change of pazagraph to note removal of the diversion ditch. <br />Page 91 Paragraph 1-Removal of the requirement for the Rill and Gullying survey. <br />Page 92 Paragraph 3-All the reclamation tasks completed. <br />Page 93 Revision of the Table 18, Critical Path Tasks During Reclamation with associated <br />reclamation costs. <br />Change in the last sentence regazding bond amounts for the Eastside Mine. <br />Should you have any additional questions please contact me at the above letterhead address or phone <br />number. <br />Sincerely, <br />u~~ ~~~ <br />Stephen Self <br />
The URL can be used to link to this page
Your browser does not support the video tag.