ECf~~VED <br />UTILITY FACILITIES AREA BOND RELEASE REQUES'~E~ ~ 0 2003 <br />Division of Minerals and Geolog" <br />1. Date of request: September 9, 2003 <br />2. Permittee: The Pittsburg & Midway Coal Mining Co. <br />3. Permit number: C-80-001 <br />4. Date permit was approved: November 16, 1981 <br />5. Mine name: Edna Mine <br />6. Phase of bond release requested: Phase I, II, III <br />7. Number of acres: 13.3 acres Disturbed acreage: 13.3 acres <br />8. - Bond-Company: - ChevrorJPRM-(Self-bond) - --- - - - <br />9. Bond number: SB-001 <br />10. Current total amount of bond: $3,839,884.00 <br />11. Original total amount of bond (for azea requested for release): $1,002,729.00 <br />12. Dollaz amount requested for release: $1,002,729.00 (See Attachment 1) <br />13. Legal description of area requested: <br />The lands requested for release lay within the following legal descriptions: <br />Section 19, T4N, R85W 6`" PM, Routt County Colorado east of the ridge crest <br />which defines the Oak Creek drainage. The western edge of this azea ties to the <br />eastern edge of the Upper Shop Facilities azea for which final bond release was <br />obtained in 1999. <br />14. Map of release request area: <br />Exhibit 1 shows the location of the bond release request azea. <br />15. Dates reclamation work performed: <br />This azea had the A-belt, B-belt, C-belt conveyors, lower tipple facility and grizzly <br />pad removed and graded in 1996. In addition, the facilities pond and powder <br />magazine were backfilled and graded and the conveyor corridor was reseeded that <br />same year. Minor rill and gully repair in the conveyor corridor azea occurred in 1998 <br />and 1999. The hillslope, including the Goat Trail, and the lower tipple facility were <br />changed to the alternate post-mining land use of commercia]/industrial in 1998 <br />under Technical Revision 37. <br />