Laserfiche WebLink
TABLE 1 -SECTION F <br />EARTHWORK <br /> <br />~~ ~~ <br /> <br /> TOPSOIL <br />o.y. EXCAVATION <br />~.y. FILL <br />o.y. BACKFILL <br />o.y. <br />ROflA AREA 8 OVERLAND CONVEYOR <br />Site Suface 25,000 46,015 68,413 <br />Transfer Station Area 1,511 985 <br />Overland Conveyor Corridor 18,000 1,500 42,500 <br />Slope Belt Excavation 50,000 <br />Reclaim & Escape Tunnels 18,185 13,918 <br />Stream Diversion Box Culverts 23,000 7,540 <br />Sediment Pond SG-2 1,541 1,628 <br />SEDIMENT POND AAB-7 <br />Sediment Pond MB-7 15,935 13,742 <br />Bridge Excavation 3,000 3,000 <br />FACILITIES PROCESS AREA <br />Product Screen/Break/Crush Area 4,000 222,000 100 <br />Product Shuttle Stockpile Area 24,000 371,000 11,000 <br />Product Reclaim Tunnel 54,488 36,056 <br />Extend Exist. Reclaim Tunnel 39,662 35,560 <br />560,000 c.y. of the excavated material (excavation from [he present LRP pile) will be transferred to the RPE. <br />exh69asecf.xls <br />September 1999 <br />