Laserfiche WebLink
<br /> <br />~ LIST OF APPEtIDICES <br />• Number page <br /> • A-1 precipitation swmnary for the period March 1-Oct. 14, <br />,. 1978 for the Mt. Gunnison Mine Reclamation Study. 58 <br /> B-1 Soil moisture measurements on Ht. Gunnison !fine <br /> Reclamation Study plots. 62 <br /> C-1 Composite laboratory soil moisture calibration curve for <br /> Mt. Gunnison Miae Reclamation Study plot refuse material. 63 <br /> C-2 Composite laboratory soil moisture calibration curve for <br /> Mt. Gunnison Mine Reclamation Study plot topsoil material. 64 <br /> ]~1 1978 soil temperature curves for 2BHRW treatment. 65 <br /> D-2 1978 soil temperature curves for 2BE%W treatment. 66 <br /> .D-3 1978 soil temperature curves £or LBEMT treatment. 67 <br /> D-4 1978 soil temperature curves for LBEMR treatment. 68 <br />~. 1~5 1978 soil temperature curves for ZBERS treatment. 69 <br />r~ I>-6 1978 soil temperature curves for 2BDM5 treatment. 70 <br /> 1~7 1978 soil temperature curves for ZBCBS treatment. 71 <br />i D-8 1978 soil temperature curves for 2BE%N treatment. 72 <br /> 1~9 1978 soil temperature curves for 2Bl~IN treatment. 73 <br />;. D-10 1976 soil temperature curves for i3CMN treatment. 74 <br /> E-1 Soil test results for selected physical and chemical <br /> parameters on "F" seam refuse materials from the <br />' Mt. Gunnison Mine Reclamation Study. 75 <br /> E-2 laboratory analysis of topsoil physical and chemical <br /> characteristics. 77 <br /> F-1 Shrub transplant survival and height measurements on <br /> level plots, October, 1978. 79 <br /> <br />vi <br />