My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV104871
DRMS
>
Back File Migration
>
Revision
>
REV104871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:16:19 AM
Creation date
11/22/2007 1:21:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
6/14/1993
Doc Name
BEAR COAL CO INC APPLICATION FOR A TECHNICAL REVISION NOV C-93-075 SEDIMENT POND DESIGN PN C-81-033
From
J E STOVER & ASSOCIATES
To
DMG
Type & Sequence
TR15
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES <br />2768 COMPASS DRIVE, SUITE 301 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (303) 245-4101, FAR 242-7908 <br />MINS ENGINEBRINC <br />MINS RECLAMATION <br />June 10, 1993 <br />iiiiiiiiiiiuiiiiii <br />sss <br />CIVIL ENGINEERING <br />CONSTRUCTION MANAGEMENT <br />RFi;E:.l~/ED <br />S. S. Shuey <br />Division of Minerals and Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bear Coal Company, Inc. <br />Application for a Technical Revision <br />NOV C-93-075, Sediment Pond Design <br />Permit C-81-033 <br />Dear Mr. Shuey: <br />JUid ? 4195 <br />G~asio~r ut rvuaerats ~ Geology <br />One of the abatement steps for the referenced NOV required the <br />submittal of a revised design of the sediment pond to ensure <br />compliance with 4.05.6. Enclosed is an application for a technical <br />revision which will incorporate the revised sediment pond design, <br />Map 11-3, into the permit. The revised sediment pond design is <br />consistent with the existing design calculations contained in <br />Exhibit 11. <br />The redesign of the pond requires: <br />1. The embankment to be raised an average of 6-inches; <br />2. The spillway to be reconfigured; and <br />3. The pond to be expanded to the north in order to provide the <br />required water capacity. <br />The material excavated to expand the pond will be pit run material <br />that will be used to fill in the slide area. <br />Please call if you have any questions. <br />Sincerely, <br />Jim Stover, P.E. <br />Consulting Engineer <br />Enclosures <br />cc: W. A. Bear, Jr. <br />
The URL can be used to link to this page
Your browser does not support the video tag.