My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-18_REVISION - M1985022
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985022
>
2007-09-18_REVISION - M1985022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:39 AM
Creation date
11/22/2007 1:21:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985022
IBM Index Class Name
Revision
Doc Date
9/18/2007
Doc Name
Cost summary form
From
American Gypsum Company
To
DRMS
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division Of Reclamation Mining And Safety <br />005 State :Colorado PermiUjob # : M-1985-022 <br />09/18/2007 .County :Park Abbreviation :none <br />KAP Site :Bullger Basin Placer Filename:M022-005 <br />Permit or otfier job action :Bond Recalculation Related to Inspection <br />Task description :Debris Removal <br />HOURLY EQUIPMENT COST Shift basis : ~ 1 per day <br />Truck/loader team -Truck :Generic 15-18 cy 6x4 <br />-Loader :CAT 953C <br />Support equipment -Load area :Cat D9R - 9SU (2005) <br />-uump area <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Truck/Loader Work Team <br />Truck ~ Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader ~ Water Truck <br />Import data filename : truck2 trakload dozer NA NA NA <br />Utilization-machine : 100 92 100 NA NA NA <br />-Ripper attachment: NA NA NA NA _ NA NA <br />Ownership cosVhour: $19.20 $29.45 $62.35 NA NA NA <br />Operating cosUhour: $53.05 $31.43 $103.27 NA NA NA <br />Ripper op. cosUhour: NA $0.00 $0.00 NA NA NA <br />Operator cosUhour: $21.72 $32.78 $32.78 NA NA NR <br />Unit subtotals : $93.96 $93.66 $198.40 NA NA NA <br />Number of units : 3 1 1 0 0 0 <br />Group subtotals : Work : $375.54 Support : $198.40 Maintenance : $0.00 <br />Total work teamcosVhour'. $573.94 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 1,000 CCY factor: 1.215 volume: 1,215 LCY <br />Source of quantity take-off :Inspection <br />Source of estimated swell factor :Scrap Metal <br />Material purchase cost : $0.00 /LCY Total cast : $0 <br /> <br />HOURLY PRODUCTION~~ <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,600 pounds/LCY Struck volume : 15.00 LCY <br />Descr.: Limestone -Broken Heaped volume : 18.00 LCY <br />Rated payload : 63,980 pounds Average volume : 16.50 LCY <br />Payload capacity : 24.61 LCY Adjusted volume": 18.00 LCY <br />Final truck volume based on number of loader passes : 16.71 LCY <br />'truck volume adjusted to not exceed rated payload or heaped volume <br />Loadino Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 12,300 <br />Rated capacity (nom, heaped) : 2.250 LCY Truck Loader Source <br />Descr.: Blasted rock -poorly blasted (60 - 75%) Altitude adj.: 0.890 1.000 (Cat HH) <br /> <br />Bucket fill factor : 0.675 <br />Job efficiency : 0.830 <br />0.830 _ <br />(1 shifUday) <br />Adjusted bucket capacity : 1.519 LCY Net correction :I 0.739 0.830 <br />sheet 1 oft <br />
The URL can be used to link to this page
Your browser does not support the video tag.