My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-18_REVISION - M1985022
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985022
>
2007-09-18_REVISION - M1985022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:39 AM
Creation date
11/22/2007 1:21:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985022
IBM Index Class Name
Revision
Doc Date
9/18/2007
Doc Name
Cost summary form
From
American Gypsum Company
To
DRMS
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 01/3 112 0 0 7 <br />User : KAP <br />State :Colorado PermiUjob # :M-1985-022 <br />County :Park Abbreviation :none <br />Site :Bullger Basin Placer Filename :M022-003 <br />Agency or organization name :Colorado~Division Of Reclamation, Mining, And <br />Permit or other job action :Bond Recalculation Related to Inspection <br />Task description :Ripping Road <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Shift basis: 1 perday <br /> Data source : (CRGJ <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $58.24 NA <br />Dozer operating casUhour : $73.75 100 <br />Ripper operating cost/hour : $6.85 100 <br />Operator cosUhour : $32.78 NA <br />Total unit cost/hour : $171.63 Total fleet cosUhour : $171.63 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 0.60 ~ acres Rip depth (ft) : 1.00 Volume : 968 BCY or CCY <br />Source of estimated quantity :Reclamation Plan and Maps <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds:/hour per selected method : _ 1,326.18 cu, yds./hour <br />Area : Avg. ripping depth : 1.00 feeUpass Site altitude : 12,300 feet <br />Average ripping width : 7.08 feeUpass Altitude adjustment : 0.94 (Cat HB) _ <br />Average ripping length : 500.00 feetpass Job efficiency factor : 0.83 (1 shifUday) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.78 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.822 acres/hour Adjusted unit production : 1,034.69 cu. yds./hour <br />Unadjusted production : 1,326.18 cu. yds./hour Adjusted fleet production : 1,034.69 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time : 0.94 hours <br />Unit cost : $0.166 per cu. yd. Total job cost : $161 <br /> <br />8SU (200; Horsepower : 310 <br />
The URL can be used to link to this page
Your browser does not support the video tag.