My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-18_REVISION - M1985022
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985022
>
2007-09-18_REVISION - M1985022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:39 AM
Creation date
11/22/2007 1:21:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985022
IBM Index Class Name
Revision
Doc Date
9/18/2007
Doc Name
Cost summary form
From
American Gypsum Company
To
DRMS
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT ~ sheet~2 of 2~ <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description CosUhour/unit (No. units) CosUhr/fleet CosUhr/fleet <br />-Generic 15-18 cy, 6x4 $93.96 3 $281.88 $281.88 <br />-Flatbed Truck, 4x2, 30K GVW _ $47.52 1 $47.52 $47.52 <br />Subtotals : $329.39 $329.39 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Breckenridge <br />Transportation Cvcle Time Non- Total one-way travel distance : 36.0 miles <br />Roadable Roadable Average travel speed : 30.0 mph <br />C....L........a C....:...~.....a <br />Haul time (hours) = 1.20 1.20 <br />Return time (hours) = 1.20 1.20 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = 3.40 2.40 <br />Total non-roadable mob/demob cost * <br />'two round trips with haul rig <br />Total roadable mob/demob cost ** <br />"one round trip, no haul rig <br />$3, 241.88 <br />$790.54 <br />JOB TIME AND COST Total job time : 6.80 hours <br />Total job cost : $4.032 <br />
The URL can be used to link to this page
Your browser does not support the video tag.