Laserfiche WebLink
,, <br />11. Drainage control on site. Drainage control at the drill-sites will be through an integrated system, <br />using grading and berms to limit and control surface runoff, mud pits excavated within the <br />footprint of the pad to contain all drilling jluids, and either rock check-dams, silt fence, or straw <br />bales/wattles installed at the low point of the drill- pad to contain sediment and control any <br />discharge. <br />12. All roads to be used for pro}ect, and existing conditions of roads, and anticipated improvements: <br />Existing ranch roads, and jeep trails will be used to access the drill-sites, exceptfor limited road <br />segments that may be necessary to access individual drill-sites. A majority of the existing ranch <br />roads have been graveled and are adequate for the intended purposes of the exploration project. <br />Environmental Analysis (Provide the following information for the checked items) <br />^ ~GeoloQic hazards <br />^ 'tigation techniques proposed for geologic hazazds <br />^ Hy logic hazazds <br />^ Mitigat techniques for hydrologic hazazds <br />^ Wildlife ~ acts -Report from Division of Wildlife <br />^ Suggested mi ' ation (from Division of Wildlife) <br />^ Wildfire hazards <br />^ Mitigation techn <br />from State Forester) <br />r wildfire hazazds <br />^ Soils: Erosion control anagement practices -report ~0i~n Soil Conservation Service <br />See attached report. <br />Petitioner shall provide a report on he followi <br />1. Air pollution potential from facilities, r s and/or equipment. <br />2. Air pollution controls on facilities, <br />3. Water pollution controls. <br />4. Noise abatement <br />Hours of operation <br />Distance <br />Type of equip nt <br />5. Landscaping, e~rth moving, visual screening plan and/or landscape <br />See attacheQ report. <br />Plan <br />of existing and final contours, retaining wall(s) and other structures. <br />future land use(s) and its locations. <br />