My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV104683
DRMS
>
Back File Migration
>
Revision
>
REV104683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:16:04 AM
Creation date
11/22/2007 1:19:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Revision
Doc Date
3/2/2006
Doc Name
Letter & Application
From
J.E. Stover & Associates Inc
To
DMG
Type & Sequence
MR16
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pF'CO <br />~~ ~8 <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />s 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />~`,'w; D <br />MAR 0 2 2006 <br />APPLICATION FORM FOR A REVISION <br />owuwn~'"^"1Bfeped TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or fgures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right comer of each revision page. A cover letter to the revision should explain the nature of the <br />reyision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - 1981 - 047 Date: 02 / 28 / 2006 <br />Permittee: Minrec, Inc. <br />Street: <br />City: <br />State: <br />Blue Ribbon Mine <br />P.O. Box 60340 <br />Grand Junction <br />CO Zip Code: $1506 _ <br />Brief Description of Revision: Amend reporting schedule for bench piezometers <br />and bench underdrains. Remove reference to pond 3 <br />outfall 002 since Oxbow has assumed responsibility for <br />pond 3. <br />Public Notice Attached: Yes No /. (Required for PRs and TRs) <br />Bond Increase: Yes No / Federal / Non-Federal Mine <br />Proposed Change in: <br />Permit Area - <br />Disturbed (+/-) _ _ 0 . 0 Acres <br />Permit (+/-) _ _ 0. 0 Acres <br />Affected (+/-) _ _ 0 0 Acres <br />Mineral Ownership - <br />Minerai Private (+/-) _ _ 0 0 Acres <br />Mineral Federal (+/_) _ _ 0 0 Acres <br />Surface Ownership - <br />Private Land (+/-) _ _ 0 0 Acres <br />Federal Land (+/-) _ _ 0 . 0 Acres <br />State Land (+/-) _ _ 0 ~ Acres <br />Mineral State (+/-) _ _ 0 0 Acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.