Laserfiche WebLink
<br />Table 34-2. Sediment control ponds proposed to be built at Trapper Mine at a <br />future date upon receipt of Division approval. (NOC a part of this revision.) <br />New Pond to <br />Be Constructed <br />New West Buzzard Pond No. 1 <br />New West Buzzard Pond No. 2 <br />New West Buzzard Pond No. 3 <br />New East Buzzard Pond No. 2 <br />New Elk Pond No. 1 <br />HBH/jb 5/87 <br />