Truck/Loader Team Work cont'd Task # : 04o sheet 2 of 2 <br />Loadlna Tool Cvcle 71me : Number of loading tool passes required to fill truck : 6 passes <br />Excavators and front shovels •machine cyGe time vs. job condition rating : AVERAGE <br />-selected value within basic rating : AVERAGE <br />Track loatlers -material descr.: NA <br />-cycle time elements (min.) : Load : NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic loader cycle time (load, maneuver, and dumF NA minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material: NA NA NA <br />Stockpile : NA NA NA <br />Truck ownership : NA NA NA <br />Operation : NA NA NA <br />Dump target : NA NA NA <br /> Net cycle time adjustment : NA minutes <br /> Adjusted loader cyGe time (total time per loader pass) : 0.321 minutes <br /> Net load time per truck' ; 1.705 minutes <br />Truck CVCIB TII11B : 'bulk of tst loatler cycle complatetl tludng truck exchange if atll. loatler cycle tim e <exchange time <br />Truck exchange time ": 0.50 minutes........ Adjusted for site altitude ; 0.500 minutes <br />Truck load time: 1.705 minutes........ Adjusted for site altitude : [.705 minutes <br />Truck maneuver and dump time; 0.90 minutes........ Adjusted for site altitude : 0.900 minutes <br />"set et 0 if exchange time < edf Bader cycle time (truck exchange completed tluring 1st loatler cycle) <br />Truck travel (haul & return) time: Road condition : NA-user <br />Haul route <br />Road <br />segmema Haul distance <br />(miles) Grade <br />res. (%) Rolling <br />res. (°/) Total <br />resistance (%) Speed <br />(miles/hour) Travel time' <br />(minutes) <br />1 2 NA-user NA-user NA-user 40 3.750 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : Haul time " • 3.750 <br />1 2 NA-user NA-user NA-user 40 3.750 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />ninutes <br />• travel time shown for each segment irxludes aceeleratkxJdeceleration adjustment Return time": 3.750 minutes <br />rolal hem antl remm time shown incwdes attitude atliustmam Total truck cycle time : 10.605 minutes <br />Loading tool unit production : 477.55 LCY/hour...... Adjusted for job efficiency : 396.37 LCY/hour <br />Truck unit production : 9S.29 LCY/hour...... Adjusted for job efficiency : 62.41 LCY/hour <br />Optimal no. trucksAoading tool : 5 trucks........... Selected no. trucksiioader : 5 trucks <br /> Adjusted houdy truck team production : 412.07 LCY/hr <br /> Adjusted hourly single truck/loader team production : 396.37 LCY/hr <br /> Adjustetl hourly multiple truckAoader team production : 396.37 LCY/hr <br />JOB T1ME AND COST <br />Fleet size : 1 Team(s) Total job time : 9.16 Hours <br />Unit cost : $1.116 /LCY Total job cost : $4,052 <br />