Laserfiche WebLink
PROJECT IDENTIFlCATION <br />UNA COSTS <br />PenninNg action <br />CIRCES Cost EstimatinaSotlware <br />DEMOLRION WORK <br />Agency or organization name : Coloratlp Division OI Minerals MdGeology <br />Taskp: 037 State: Colaredo PermNObp:P92-081 <br />Date: 25-Feb-2003 County: ROUtt Abbreviation: none <br />User: JRS Site: Hayden Gulch LOadpuf Filename: L081-037 <br />Pennif Renewe102 <br />Task description :Demolish and Remove All Shuctures <br />Last unit cost update: /arfuary, 2003 Location adjustment: IM.60% <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLRION MENU SELECTION DUANTITV UNIT UNIT COST TOTAL COST <br />-OHice Supersfrvcture 30'x63'x10' DemoJdisp./eppr. dump-ro5mi. 1,900.00 CF $0.6936 $1,31]Tl <br /> <br />-BaiMlalle'1 Supersructure 25'x40x10' Demo./disp./eppc dump-ro5mi. 10,000.00 CF $0.6936 $6,93565 <br />- Floor 25'x30'x6' Demo./tlisp. exc. pit, 6'1h: 2000. 1,050.00 SF $1.2481 $1,310.50 <br />Footing 1X2'x1 f0LF Demo./disp. exc. pd, 1'x2'-200 ft. 110.00 LF 54.9924 SSd9. 16 <br /> <br />-Crusher Buiklmg SuperstrvQVre 25'x30'x30' Demc!disp/apPr. tlump-fo5mi. 22,50000 CF $06936 $16, 605 Z0 <br />- Floor 30'x35'x12' DemoJdisp. exc. prt. 12Th.-2000. 1,050.00 SF $2.4962 52,621.00 <br />Foofin 2'x3'x1p4 LF Demo./disp. exc. pit 2'x3'-200n ]00.00 LF $14.9]]2 $1,55263 <br /> <br />-Train Loedouf SuperstrucNre 30'x35'x60' Demo./displappr. dump - to 5 mi. 63,000. W CF $0.6936 543,694.57 <br />- Floor 30k35'x]2' Demo./tlisp. exc. pd, 12Th.-2000. 1,050.00 SF $2.4962 52,621.00 <br />- Footing 2x3'x130 LF DemoJdisp. axe pil. 2'x3'-200ft 130.00 LF 514.9]]2 $1,947.03 <br /> <br />-Truck Dump Hopper Superstructure 30X12'x10' Demo/dispJappr dump-ro5mi 6,600.00 CF $0.6936 54,57253 <br />- Floor 30'x22'x12' Oemoltlisp. exc. pit. 12Th.-2000. 660.00 SF $2.4962 51,64249 <br />- Footing 2k3'x104' Demo./disp. exc. pd, 2'x3'-2000. 104.00 LF 514.9]72 $1,551.63 <br /> <br />-Fwe Small Metal BUlldmgs-SUpersfmttures 13,010 CF TdaI Demo./tlisp./eppc dump-ro5mi. 13,010.00 CF $06936 $9,023.28 <br />Floors 1,301 SF Tpfal Demo./disp, exc. pR, 6'fh: 2000. -;301.00 SF $1.2481 $1,623.T/ <br />Footings IMk336 LF iOfdl Oemoldisp. exc. pit 1'x2'-200 a. 336.00 LF $6.9929 51,6]]. ad <br /> <br />-Reoleim Tunnel 14'x120 LF Demo./disp. exc. p4, f2'Ih.-ZOO tt. ;680.00 SF $2.4962 $4.193.61 <br />- Remove Conveyor 120 LF Conveyor, elevetetl-8'Wx10'H 120.00 LF $38.2200 54,586.40 <br />- Dispoul Charges 200 CY Load/5 mi. haul, slug - Stee10. 200.00 CY 36.8]00 51,3'4.00 <br /> <br />-Train Hopper Superstructure fODays-843 Crew 8-13 Crew 10.00 DAYS 82,152.6000 $21,526.00 <br />- Disposal Charges 500 CY Load5 mi. haul, s/vg. -Steel h. 500.00 CY $6.H700 53,435.00 <br /> <br />-Stacker Frzming end Conveyor SOays-B-l3 Crew B-13 Crew 500 DAYS $2, 152 $10,]6300 <br />Foundation 12'x500 SF Demo /disp. exc. pd. f2'th.-2000. 500.00 SF $2.4962 51,248.10 <br />Footing 1'x2"x174 LF Demo./tlisp. exc. pit 1X1'-2000. 174.00 LF $4.9924 5868.68 <br />- Disposal Charges 300 CY LoadrS mi. haul, slug. - Steel k 300.00 CY $6.8700 $2,061.00 <br /> <br />-Remove Conveyor 630 LF Conveyor, elevated-B'Wx10'H 630.00 LF $38.2200 524,0]660 <br /> <br />-Remove Water Tank 25'x14'Diamefer ExcOoaq nondeaking-3K-5Kgal. 1.00 FJ $369.5000 $369.50 <br />Olspoael Charges 150 CY Load/5 mi haul. sfvg.-Sfeeib 15000 CY $68]40 $1,03050 <br /> <br />-Remove Aailmatl Track 1].424 LF Railroad track-Ties and track g42a.00 LF $6.5200 $113.606.48 <br />Ballast 1,266 CV Raiload freck-eellast 1,266.00 LY $29400 $8.]22.04 <br /> <br />CULVEATS <br />42'CUlverts 12'x166LF Pipe, CMP-12 in. diem. 166.00 LF $9.]2]1 $L614J1 <br />4B'CUlverts 18'x469 LF Pipe, CMP-18 in. tliam. 48900 LF 511.5662 $5,424.53 <br />-24'Cvlvorts 24'x656 LF Pipe, C,NP-24 in. diem. 656 L41 LF 315.1387 $9, 93L00 <br />-36' Culverts 3fi'x50 LF Pipe, CMP - 36 in. diem. 5000 LF $26.2046 $1,310.23 <br />-42'CUNerts 42'x 152 LF CMP Removal-d2': 152.00 LF $30.5800 $4,648.16 <br />-60' Cuh2rts 60'x290 LF Pipe, CMP - 60 in. diem. 250.00 LF $58.4T/0 $16,956.33 <br />-96'Culvarts %'x165 LF Pipe, CMP-96 in. diem. 16500 LF $102.3095 $f6,6BL67 <br />-f02'CUlverts 1~'x5B5 LF CMP Removal-102' 565.00 LF $123.1400 $]2,036.90 <br />-fOB'Culverts 108'x330 LF Pipe, CMP-108 in. tliam. 330.00 LF $143.9191 54],493.29 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JCB COST Total (atl). for location): $470,237 Total Cost (unatllusted): 546],432 <br />