My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV104616
DRMS
>
Back File Migration
>
Revision
>
REV104616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:15:58 AM
Creation date
11/22/2007 1:19:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
2/26/2003
Doc Name
Adequacy Review & Cost Summary Form
From
DMG
To
Montgomery Watson Harza
Type & Sequence
RN2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Sottware <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 018 <br />Date : 02/25/2003 <br />User: JRS <br />State :Colorado PermiUjob# : C-92-081 <br />County : Routt Abbreviation :none <br />Site :Hayden Gulch Loadout Filename : CO81-018 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal 02 <br />Task description : Regrade Truck Loop Pond <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 1,000 <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Utilization <br />Swell Loose <br />BCY factor: 1.250 volume: <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />1,250 <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly production <br />100 feet <br />1,243.2 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient: 0.00 % (I <br />Average site altitude : 6,400 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.34C /LCY <br />Ownership cosVhour <br />Operating cosUhour <br />Ripper op.cosVhour <br />Operator cosUhour <br />Total unit cosUhour <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />$53.00 NA <br />$87.21 100 <br />$0.00 0 <br />$24.01 NA <br />$164.22 Total fleetcosUhour <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude <br />Material weight : 1.00 <br />: 0.87 <br />Blade type : 1.00 <br />Net correction : 0.39 <br />$164.22 <br />LCY <br />Source <br />Adjusted unit production : 483.43 LCY/hr <br />Adjusted fleet production : 483.43 LCY/hr <br />Total job time : 2.59 Hours <br />Total job cost : $425 <br />
The URL can be used to link to this page
Your browser does not support the video tag.