My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV104616
DRMS
>
Back File Migration
>
Revision
>
REV104616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:15:58 AM
Creation date
11/22/2007 1:19:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
2/26/2003
Doc Name
Adequacy Review & Cost Summary Form
From
DMG
To
Montgomery Watson Harza
Type & Sequence
RN2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task#: 007 <br />Date : 02/25/2003 <br />User : JRS <br />State :Colorado <br />County : Routt <br />Site :Hayden Gulch Loadout <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal 02 <br />Task description :Rip Haul Roads <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic <br />Area <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 1-shank ripper <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $53.66 NA <br />Dozer operating cosUhour : $8727 100 <br />Ripper operatingcost/hour : $11.08 100 <br />OperatorcosUhour : $30.65 NA <br />Total unit cosUhour : $182.59 Total fleet cosUhour <br />NA NA <br />3.33 acres <br />$182.59 <br />Loaq factor : NA Bank volume : NA BCY <br />Rip depth (ft) : 3.00 Volume : 18,117 BCY or CCY <br />Source of estimated quantity :Division Estimate <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feeUsecond <br />Unadjusted production : NA cu. yds./hour <br />Area : Avg. ripping depth : 4.05 feeUpass <br />Average ripping width : 6.08 feeUpass <br />Average ripping length : 200.00 feeUpass <br />Average dozer speed: 88.00 feeUminute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.664 acres/hour <br />Unadjusted production : 4,338.16 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) <br />Unit cost : $0.051 per cu. yd. <br />Unadjusted production <br />per selected method : 4,338. f6 cu. yds./hour <br />Site altitude : 6,400 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shifUdayJ <br />Net job correction : 0.83 multiplier <br /> <br />Adjusted unit production : 3,600.67 cu. yds./hour <br />Adjusted fleet production : 3,600.67 cu. yds./hour <br /> <br />Total job time : 4.48 hours <br />Total job cost : $817 <br />PermiUjob # : C-92-081 <br />Abbreviation :none <br />Filename : C081-007 <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.