My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV104616
DRMS
>
Back File Migration
>
Revision
>
REV104616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:15:58 AM
Creation date
11/22/2007 1:19:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
2/26/2003
Doc Name
Adequacy Review & Cost Summary Form
From
DMG
To
Montgomery Watson Harza
Type & Sequence
RN2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatino Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 02/25/2003 <br />User : JRS <br />State :Colorado Permitfjob# : C-92-081 <br />County : Routt Abbreviation :none <br />Site :Hayden Gulch Loadout Filename : C081-001 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewa102 <br />Task description : Regrade Rail Loop <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Shift basis : 1 per day <br />Utilization <br />Cost Breakdown <br />Data source : (CRG) <br />Ownership cosVhour <br />Operating cosUhour <br />Ripper op. cosUhour <br />Operator cosUhour <br />Total unit cosUhour <br />MATERIAL QUANTITIES <br />Initial <br />volume: 64,000 BCY <br />$53.00 ~ NA <br />$87.21 YDO <br />$0.00 0 <br />$24.01 NA <br />$164.22 Total fleet cosVhour <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Operator skill <br />Average push distance : 200 feet Material consistency <br />Unadjusted hourly production : 700.0 LCY/hr Dozing method <br /> Visibility <br />Material consistency description : Job efficiency <br />Compacted fill or embankment Spoil pile <br /> Push gradient <br />Average push gradient : 10.00 % (neg) Altitude <br />Average site altitude : 6,400 feet Material weight <br /> Blade type <br />Material weight : 2,650 Ibs/LCY Net correction <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production <br />Adjusted fleet production <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time <br />Unit cost : $0.492 /LCY Total job cost <br />0.75 <br />Swell Loose <br />factor : 1.250 volume : 80,000 LCY <br />Horsepower: 405 <br />0.90 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.22 <br />1.00 <br />0.87 <br />1.00 <br />0.48 <br />$164.22 <br />Source <br />333.57 LCY/hr <br />333.57 LCY/hr <br />239.83 Hours <br />$39,384 <br />
The URL can be used to link to this page
Your browser does not support the video tag.