Laserfiche WebLink
. II I I II I II I II IIII III • ~eBr>taD soon sloes <br />Boettcher Plant <br />P.O. Bos 2227 <br />Fort Collins. Colorado 80522 <br />303 482 4065 <br />II~EfL. <br />April 9, 1988 ~~~~~~~o <br />APIA 2 p ~ <br />Mined Land Reclamation Division ppM~~~~~~~~~~~ <br />423 Ceateaninl Building ~atUfd,~ <br />1313 Sherman St. ICUfCfS <br />Denver, CO 80203 <br />REt Boettcher Limestone Quarry, Permit No. 77-348, Bonding <br />Dear Sirs, <br />The current Boettcher plant raw mix utilises weathered material <br />Prom two horisoae of the Niobrara formation in addition to the <br />massive basal limestme member. Ia order to develop the quarry <br />in an orderly manner, Ideal ie hereby applying for bm ding oP five <br />areas of the Boettcher quarry, covered by the referenoed permit, ea <br />ahoy on the acaompa~yiag maps. Parcels 1, 2, anti 3 Pill in <br />between previously bonded areas, and parcels 4 and 5 are c mtiguatle <br />with previously bmded areas. The Boettcher quarry has 37b acres <br />presently bmded in the amount of X432,000, or X1,152 per sore. <br />All areas o£ the gtarry are c msidered active except the north <br />900 feet is which mining was completed in 1986. <br />Ideal proposes to bmd the subject areas, approximately 126.5 scree ae <br />measured by plaaimeter, at the same rate, for an additional bond oP <br />;145,000, bringing the total bmd to X578,000. If this is acoeptable <br />to the Division, please notify this oPfYce sad the band increase <br />will be £ororarded. <br />If you have any queati ms, or need any further information, please <br />call. <br />Sincerely, <br />~~ ~r ~~ <br />Paul E. Thomsen <br />Sr. Mining Engineer <br />C ~yf`r <br />PET:tep ~~~' <br />I~ ~~,... <br />Enclosure x ~~ <br />n+ I <br />a ., ,, <br />iti ~ ~ , , <br />`. ~,, +.. <br />vd <br />~~1 a~ C~tr ~~ o-~' <br /> <br /> <br /> <br />~ _~ ? <br />