My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV104555
DRMS
>
Back File Migration
>
Revision
>
REV104555
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:15:53 AM
Creation date
11/22/2007 1:18:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
10/9/2007
Doc Name
Preliminary Adequacy Review
From
Colowyo Coal Company L.P.
To
DRMS
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response: Minor Revision 88 was approved by the Division on August 21, 2007. Colowyo has fulfrlled <br />this stipulation requirement. No additional information is required. <br />£ Stipulation 7: The Colowyo Coal Company shall submit a TECHNICAL revision to <br />the Division which provides an analysis of groundwater points of compliance at the Colowyo <br />Mine pursuant to Rule 4.05.13(1). This analysis will be done in consultation with the <br />Division and will include a written determination of the need for groundwater points of <br />compliance at the mine. If deemed appropriate, based on this analysis, Colowyo shall <br />establish one or more points of compliance for the Colowyo Mine. This stipulation is a <br />future compliance issue that the Division would like to meet with Colowyo to discuss. <br />The Division would like to meet prior to the end of September 2007 regarding the <br />point(s) of compliance. <br />Response: Colowyo will be in contact with the Division in the near future to address this stipulation. <br />g. Stipulation 8: No later than 15 Mazch 2008 Colowyo Coal Company shall submit a <br />Technical Revision to the Division containing a comprehensive reclamation plan for the East <br />Pit, West Pit, Section 16 Pit, South Taylor Pit, facilities area, Gossard Loadout and all <br />remaining disturbances at the Colowyo Mine. The revision will update some methods of <br />reclamation that aze currently used at the Colowyo Mine. Further, the revision will address <br />Division concerns regarding revegetation, soils handling and species diversity success <br />standards, etc. to meet the current post-mining land-use. Consultation with the Division, the <br />Colorado Division of Wildlife, the Bureau of Land Management and other appropriate <br />agencies will be necessary. This stipulation is a future compliance issue that is due on or <br />before 15 March 2008. The Division would like to meet with Colowyo and all necessary <br />parties prior to the submittal of the Technical Revision to work through the numerous <br />issues involved. The following dates are suggested: 17 September 2007, 21 September <br />2007 or 24 September 2007 as any one of the dates works well with the Division and <br />DOW personnel. <br />Response: As discussed at the meeting held at Colowyo Mine on Monday, September 24 including <br />attendees Jim Stark (DRMS), Dan Matthews (DRMS), John Wagnild (CDOW), Kurtis Blunt <br />(CM), Tay Tonozzi (CM) and Tony Tennyson (CM), on-going cooperative discussions will <br />continue with regards to this matter as the submittal is developed. <br />h. Stipulation 9.• Prior to conducting any highwall mining in the South Taylor Pit the <br />Colowyo Coal Company shall submit a TECHNICAL revision to the Division including a <br />mining plan and sequence, a stability analysis and a zero subsidence analysis and plan. <br />Highwall mining may not begin in the South Taylor Pit until the aforementioned revision has <br />been approved by the Division. This stipulation is a future compliance issue that will <br />need to be addressed prior to any highwall mining in the South Taylor Pit Area. <br />Response: As previously agreed upon by Colowyo and the Division during Permit Revision 02, Colowyo <br />will submit a mine plan and subsidence analysis prior to commencing arty highwall mining in <br />the South Taylor Pit. <br />i. Stipulation 10: Prior to disturbing any lands along the Wilson Creek the Colowyo <br />Coal Company shall provide the Division with a detailed analysis and discussion of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.