Laserfiche WebLink
QS~, STATE~F COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources oe~<o <br />ti~ =' <br />Department of Natural Resources RECEIVED ~`~' ~° <br />1313 Sherman Street, Room 818 ~ •• • ia>a <br />Denver, Colorado sozo3 ~UL 0 3~2Q07 <br />Phone (303)866-3581 <br />FAX (303) 866.3589 ,~^ Division of Reclamation, <br />,V Bill flitter, Jr. <br />http://vvn~.water.state.co.us Mining and Safety Governor <br />Martis D. Sherman <br />EzecuUve Director <br />DATE: July 3, 2007 (vacant) <br />State Engineer <br />TO: Wallace H Erickson, Environmental Protection Specialist <br />CC: Division 7 Office; District 32 Water Commissioner <br />FROM: Clay Kimmi, P.E. <br />RE: Hindmarsh Sandstone, File No. M-2006-009 <br />Operator: Mesa Sandstone, LLC <br />Contact: Daren Stone 970/565-2603 <br />Section 23, Twp 36N, Rng 15W, NM P.M, Montezuma County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, <br />^ reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />^ Other: <br />CO ENTS: This office did not receive the request for review until July 2, 2007. We have acted upon <br />'~ request within 24 hours. <br />