My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV104399
DRMS
>
Back File Migration
>
Revision
>
REV104399
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:15:38 AM
Creation date
11/22/2007 1:16:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979205
IBM Index Class Name
Revision
Doc Date
5/3/2000
Doc Name
TRANSFER OF PERMIT AND SUCCESSION OF OPERATORS APPLICATION FORM
Type & Sequence
SO4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-4- <br />IV. RECITALS <br />~J <br />On MARCH 26 1997 Permit Number M-1979-205 was granted to <br />CUSTOM CRUSHING. INC. (exis[ingoperator)("Permittee"), pursuant to <br />which Pemtittee has been conducting a mining operation in the County of cARFI Ft.n .State <br />of Colorado. <br />2. Permittee wishes to assign the permit to UNITED COMPANIES OF MESA COUNTY. INC. <br />(new operator), as Successor Operator ("Successor") and Successor wishes to become Successor Permittee <br />under the permit. <br />3. Successor understands that the reclamation plan (the "Plan") required by the permit and by <br />applicable State laws and regulations has not been wmpleted and is willing to assume full responsibility <br />far the completion of the Plan. <br />V. AGREEMENTS <br />Permittee and Successor hereby agree, for their own benefit and for the benefit of the State, such <br />agreements to be effective ~ facto upon the approval by the State of the transfer of the Permit from <br />Permittee to Successor, as follows: <br />1. Successor has inspected the mining and reclamation operations to its entire satisfaction and is fully <br />aware of the conditions thereof. Successor understands and accepts all of the conditions of the Permit. <br />2. Successor will wmplete the reclamation plan, and hereby assumes liability for completing such <br />plan as to all areas heretofore disturbed, as well as to all areas hereafter disturbed. Successor will perform <br />all of the obligations of the Permittee under the Permit which have not heretofore been performed by <br />Permittee. <br />3. Successor hereby tenders to the State its attached Performance and Financial W arrantiest, which <br />are to be substituted for the Performance and Financial Warranties heretofore filed by the Permittee, <br />effective upon the release ofthe latter Warranties. <br />4. Successor represents to the State that, to the best of its knowledge, information and belief, it is not <br />in violation of any ofthe provisions ofthe Colorado Mined Land reclamation Act with respect to any other <br />operation wnduMed by it in the State of Colorado. <br />Permittee and Successor hereby request the State to consent [o the assignment of the Permit, to recognize <br />Successor as Successor Operator under the Permit, and to accept the tendered substitute Performance and <br />Financial Warranties in place of the Warranties presently on file with the State. <br />
The URL can be used to link to this page
Your browser does not support the video tag.