Laserfiche WebLink
• EXHIBIT L -RECLAMATION COSTS <br />The reclamation costs aze based on reclamation of the site as two reservoirs. These costs <br />include maintenance and repairs of the slurry walls, a pump station and its ancillary <br />facilities, stable slopes at 3:1, riprap shore protection, maintenance roads, topsoil, seeding <br />and establishing vegetation. <br />Activity Quantity Unit Unit Cost Totai Cost <br /> <br />Sluny Wall Maintenance 171,520 sf $2.00 $343,040 <br />Regrade Pit Walls to 3:1 400,000 cy $0.50 $200,000 <br />Topsoil 24,200 cy $1.80 $43,560 <br />Native Seeding 30 ac $2,500 $75,000 <br />Riprap Shores 15,000 cy $40 $600,000 <br />Pump Station 1 Is $3,500,000 $3,500,000 <br />Demolition 1 Is $25,000 $25,000 <br />Structure Removal 1 is $50,000 $50,000 <br />Subtotal $4,836,600 <br />Contingency 10% $483,660 <br />TOTAL $5,320,260 <br /> <br />n <br />LJ <br />Brannan Sand & Gravel Mining Application August 2003 <br />X:\I440000.a11\1445701\Word\Repons\Pe~mil Amedmem•12-11-03.doc <br />