My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-01-14_REVISION - M1980183
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980183
>
2004-01-14_REVISION - M1980183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:15:28 PM
Creation date
11/22/2007 1:16:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980183
IBM Index Class Name
Revision
Doc Date
1/14/2004
Doc Name
Amendment Application
From
Brannan Sand & Gravel Company
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• EXHIBIT L -RECLAMATION COSTS <br />The reclamation costs aze based on reclamation of the site as two reservoirs. These costs <br />include maintenance and repairs of the slurry walls, a pump station and its ancillary <br />facilities, stable slopes at 3:1, riprap shore protection, maintenance roads, topsoil, seeding <br />and establishing vegetation. <br />Activity Quantity Unit Unit Cost Totai Cost <br /> <br />Sluny Wall Maintenance 171,520 sf $2.00 $343,040 <br />Regrade Pit Walls to 3:1 400,000 cy $0.50 $200,000 <br />Topsoil 24,200 cy $1.80 $43,560 <br />Native Seeding 30 ac $2,500 $75,000 <br />Riprap Shores 15,000 cy $40 $600,000 <br />Pump Station 1 Is $3,500,000 $3,500,000 <br />Demolition 1 Is $25,000 $25,000 <br />Structure Removal 1 is $50,000 $50,000 <br />Subtotal $4,836,600 <br />Contingency 10% $483,660 <br />TOTAL $5,320,260 <br /> <br />n <br />LJ <br />Brannan Sand & Gravel Mining Application August 2003 <br />X:\I440000.a11\1445701\Word\Repons\Pe~mil Amedmem•12-11-03.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.