Laserfiche WebLink
• Water Augmentation <br />Brannan has an approved Substitute Water Supply Plan approved on Mazch 2, 1993 <br />(attached). Water has been provided for augmentation annually from a variety of <br />sources. Substitute water for 2003 is being provided by the Cherry Creek Valley Water <br />Users Association. Brannan will continue to provide augmentation of depletions until the <br />mining is complete of replacement of all water inside the sluny wall is replaced in full. <br />Floodplain <br />The site is located neaz the South Platte River and Second Creek, however the site is <br />contained entirely within Flood Zone X, areas determined to be outside the 500-yeaz <br />floodplain. The approximate location of the site and floodplain associated with the South <br />Platte River and Second Creek aze shown on Figure G-2. This information was obtained <br />from the Federal Emergency Management Agency, Flood Insurance Rate Map Nos. <br />08001COSSG and 0800100065E dated August 16, 1995. <br />• <br /> <br />Brannan Sand & Gravel Mining Application August 2003 <br />X:\1440000.a11\1445701\WordUtepotts\Pmnit Amedment-12-I1-03.doc <br />