_ i II
<br />-- ~ iISI ('- yam' ~
<br />_ ~ ~ ~d ~
<br />~/, 1'I i~S ~~)i 1
<br />1C.¢aY +-~vcv~s~ ~ l; e~I Gi~
<br />~.~r~~11
<br />~- ~ ~ t-1
<br />The following documents, submitted to the Division in [he course of the 1985 permit
<br />application, the 1997 permit amendment, or the 2000 technical revision, or with respect
<br />[o compliance with the DMG permit, are considered relevant to the question of the
<br />completeness and approvabiliry of the current permit application, and may also be
<br />referred to by [he objectors.
<br />Apr. 25, 1985 DMG original Type 110 quarry permit
<br />Dec. 6, 1996 Application for pet~rtit amendment to expand onto Section 36
<br />(hereinafter referred [o as I997 permit amendment)
<br />Apr. 22, 1997 James Dillie, Technical review of Red Canyon amendment application
<br />Iviay 9, 1997 Robert Stack reply to DMG technical review
<br />May 20, 1997 James Dillie, followup to Stack reply to technical review
<br />June 12, 1997 Robert Stack reply to DMG followup comments
<br />(Attached Soil Conservation Service soil and vegetation type report)
<br />June 17, 1997 R. Stack reply to J. Dillie May 20 followup comments
<br />June 21, 1997 R. Stack letter re amendment application
<br />June 24, 1997 Calculation of bond on amended acreage
<br />July 1, 1997 DMG notice of approval of 1997 permit amendment
<br />July 9, 1997 Robert Stack letter to J Dillie suggesting minor changes in reclamation
<br />plan to lower cost of reclamation.
<br />Apr, 13, ]998 Hecks' complaint letter to DMG requesting quarry inspection
<br />Apr. 28, 1998 James Dillie quarry inspection report ~
<br />May 7, 1999 Record of Robert Stack call to DMG re sediment pond breach.
<br />May 9, 1999 Robert Stack letter to DMG sediment pond breach.
<br />June 4, 1999 James Dillie site visit report corrective action due date Aug. 9 1999. .
<br />June 8,.1999 Sediment pond cross-section (isolated page)
<br />(June 4, 99 date on sed pond sketch)
<br />Sept. 14, 1999 James Dillie letter to Robert Stack re nonreceipt of corrective action
<br />submittal
<br />October 4, 1999 Stack letter to Dillie difficulty in determining 2 year rain event
<br />Nov. 23, 1999 R. Mangone, RMMA to Van Truan, ACOE reply to Nov. 16 correction notice
<br />Dec. 21, 1999 James Dillie letter to Robert Stack re 9/21 watershed study
<br />Dec. 22, 1999 James Dillie response to Lori Potter re Fifield report
<br />Jan. 6, 2000 Jerry Fifield cotnment on Dec. 21 DMG letter
<br />Feb 8, 2000 Lori Potter letter to James Dillie re Fifield cotments, runoff flow thru
<br />quarry
<br />Mar. 16, 2000 RMMA storm water management submission (new Wheeler study)
<br />(April, 2000 Date of new Wheeler study) t:-
<br />June 28, 2000 USFWS letter to RlvflvfA replying to May 18 letter re TAA
<br />Apr. 11, 2000 Lori Potter letter to DMG re sediment pond inadequacy
<br />Apr. 13, 2000 DMG letter indicating storm flow study inadequate
<br />May 20, 2000 R. Stack letter [o Dillie re Wheeler repott
<br />May 29, 2000 R. Stack letter to Dillie re Wheeler repott.
<br />July 16, 2000 Technical revision on site washing operation approval.
<br />Aug. 22, 2000 James Dillie to R Stack re Technical Rev 1, sediment ponds + hydrology
<br />Aug .23, 2000 James Di]]ie notice of approval of Technical Rev. 1
<br />
<br />
|