Laserfiche WebLink
<br />• <br />• <br />gray :;a*_er <br />The temporary shower facility vrili disci}arge aaproxir..ateiy 1,~JtSp <br />gallons of gray water per day. It is proposed that this grater ~e <br />channeled into the temporary sediTM.ent control impoundment pehind <br />the old railroad grade. Aftec Pond A is operating, the gray <br />water ~•rill be directed into Pond A according to the arproved <br />plan. The temporary sediment control impoundment Brill nave been <br />stringed of topsoil before the gray water is cischarged into it. <br />^emoval of the topsoil material ~•rill increase the capacity of the <br />ir.~,poundment by 292,000 ga1'_ons. Cray water will be discharged <br />into t'ne impoundment for approxiaateiy three c•ree:s and could <br />amount to as much ~:, 21C7 gallons. 'Phe increased capacity from <br />stripz~inq the tepsoii fror.~ the impoundment area will more than <br />compensate for the additional inf7.ow from gray water. <br />Conclusion <br />environmental integrity of the site. <br />It is renuested tnat tae ll_v'sion Grant 3ppCOVa1 t0 :ew Castle <br />°nergy Corporation t0 CORStrLLCC and OT%2 Cdte 3 temporary 7aCliing <br />_ot and material iaydovn a_ea descrioed above. The use of this <br />facility is essential to tide construction of the mine portals. <br />::itication ^easure~ to be employed at the site trill assure rile <br />~) O <br />N~ <br />~~ <br /> <br />~J <br />/"_ ` " <br />~~ O <br /> <br />~~ j ~~~ <br /> <br />~~ W~ ~ <br />S~~ <br /> <br />