My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV104135
DRMS
>
Back File Migration
>
Revision
>
REV104135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:15:15 AM
Creation date
11/22/2007 1:14:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
1/5/2000
Doc Name
RESPONSE TO RECENT COMMENTS SAN LUIS PROJECT M-88-112
From
DMG
To
WESTERN MINING ACTION PROJECT
Type & Sequence
TR26
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6.7.4 Rip rap transportation - $675 <br />B.7.5 Rip rap placement - $2,120 (includes collection pond) <br />B.8 Collection Pond - $ 62,915 <br />B.8.1 Liner disposal- $800 <br />B.8.2 Backfill -loader = $14,145, trucks = $47,970 <br />C) Mill Facilities - $647,764 <br />C.1 Building demolition & removal - 1,492,737 cu-ft @ $.22/cu-ft = $328,402 <br />C.2 Concrete floor and containment removal costs - 43,898 sq-ft @ $3.23/sq-ft = $141,790 <br />C.3 Five inch concrete floor removal - 8,250 sq-ft @ $5.05/sq-ft = $41,663 <br />C.4 Rip mill azea - 23.5 acres @ $90/acre = $2,115 <br />C.5 Grade mill azea - 23.5 acres @ $330/acre = $7,755 <br />C.6 Topsoil placement - $2,310/acre for 23.5 acres =$54,285 <br />C.7 Topsoil grading - $257/acre for 23.5 acres = $6,040 <br />C.8 Rip ROM stockpile azea- 22 acres @ $90lacre = $1,980 <br />C.9 Grade ROM azea - 22 acres @ $330/acre = $7,260 <br />C.10 Topsoil placement ROM azea - $2,310/acre for 22 acres = $50,820 <br />C.11 Grade topsoil ROM area - $257/acre for 22 acres = $5,654 <br />D) Roads and Pazking Area - $ (04,545 <br />D.1 Ripping - 35 acres @ $90/acre = $3,150 <br />D.2 Grading - 35 acres @ $330/acre = $11,550 <br />D.3 Topsoil placement - 35 acres @ $2,310/acre = $80,850 <br />D.4 Grade topsoil - 35 acres @ $257/acre = $8,995 <br />E) Road Maintenance -$41,760 <br />E.1 Water truck - 8 hours x 6 times/year x 6 years x $75/hr = $21,600 <br />
The URL can be used to link to this page
Your browser does not support the video tag.