Laserfiche WebLink
Attachment A <br />Estimated Capital and Maintenance Costs for a Logan Wash Mine <br />Retort Water Treatment System <br />Item Estimated Cost <br />Water Treatment Plant <br />Oil-water separator <br />Multi-media filtration <br />Reverse Osmosis units (3, 10,000 gpd frames) <br />Softener $65,000 <br />Pump Systems $ 4,000 <br />Storage Tanks <br />2, 10,500 gal $18,000 <br />Steel Building <br />12 ft by 20 ft $40,000 <br />Brine Pond <br />60ftby80ft <br />HDPE liner $ 7,000 <br />Power Line Construction $280,000 <br />Permitting <br />DRMS, BLM, County $10,000 <br />Total Capital Costs: $424,000 <br />Maintenance <br />Power Requirements $ 7,000 <br />Monitoring <br />Labor ($75/hr ;20 hrs/wk) $78,000 <br />Travel mileage $14,100 <br />Analytical sampling $10,000 <br />Administration and Reporting ($95/hr; 2 hrs/wk) $ 9,900 <br />Servicing (parts replacement, repairs) $ 4,000 <br />Annual BLM ROW $ 600 <br />Brine removal $ 6,000 <br />Total Annual Maintenance $129,600 <br />11 <br />