My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-07-06_REVISION - M1982015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982015
>
2006-07-06_REVISION - M1982015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:45:03 PM
Creation date
11/22/2007 1:13:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Revision
Doc Date
7/6/2006
Doc Name
Fax of Decision Information and 2nd Ad.
From
DMG
To
Jodi Villa
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rule (r.~l.~i E•;xhinit [)- !Mining Plan <br />4. Please designate if disutrhances such as mine benches or water impoundments will <br />occur and ifso specify their dimensions and locate on a map. FUL1a' AI)I)Rh:SSI:D <br />5. Please clearly mark the permit boundaries on site and suhmit photos of this to DMG. <br />FULLY ADDRESSED <br />6. Please obtain and submit to Db1G a letter authoriiint ~leunr & Associates to act as <br />D~iG's direct permitting contact on behalfof Mr. ~9ikc Siegrist until the conclusion of <br />this amendment process. h'1.1,LY ADDRLSSP.D <br />Rule 6.4.5 Exhibit F.- Reclamation Plan <br />7, 'T'he Division received comments retarding this amendment from the Of7ice of the <br />State Engineer and the Corps of Engineers on April 6, 21)Ix>. "these comment letlcn <br />were provided to the operator during the pre-opcrotion inspection of April I I. '1106 <br />(and arc enclosed with this adequacy letter, as well). Additionally, the Division <br />received a comment letter from the Colorado [{istorical Society on April 13, 2006, <br />which is also enclosed. Please address these letters accordinelV. FULLY <br />ADDKIiSSED <br />3. Please further descrihe the dimensions of the topsoil pile(s) that will he stored on site <br />and slate the anticipated amount o(cubic yards o(topsuil that will he stored on-site at <br />all times. PULLY' ADDRESSED <br />9. Please provide additional information regarding revrgctation techniques that will be <br />implemented on site i.e. mulching (application method and rate%acrej and fertilizer <br />(application method and ratehtcrel. F[1LLY' :1DDRI=:SSF.D <br />l0. Please provide a vegetation description per Rule 6.4.31,e) this information can he <br />obtained from Natural Resources Conscrva[ion Service. FULLY ADDRESSED <br />I L Plc:tse provide additional information regarding the location and source. of borrow <br />material to be used on sift. If material is imported (tom oR~-site, please rcler to Rule <br />3.1.5(9) (copy enclosed) and supply the information rcyuircd by this rule. I~ULLI' <br />ADDRfiSSF.D <br />12. Please provide an explanation as to the use and~or disposal of the concrete stockpiles <br />found on site during the inspection. FUL[_Y ADDRESSED <br />13. Please descrihe how the asphalt road at the south edge of the ponds (hetwcen the main <br />pond and the St. L'rain) will be reclaimed. FULLY ADDRESSED <br />14. Please provide documentation revising the grade of the svimming area front 3h:ly to <br />Sh:ly as rcyutrcd by Rulc 3.1.5(71. FL!LLY' ADDRESSED <br />
The URL can be used to link to this page
Your browser does not support the video tag.