My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-07-06_REVISION - M1982015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982015
>
2006-07-06_REVISION - M1982015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:45:03 PM
Creation date
11/22/2007 1:13:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Revision
Doc Date
7/6/2006
Doc Name
Fax of Decision Information and 2nd Ad.
From
DMG
To
Jodi Villa
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.12 t:XHINIT 1. -Reclamation Costs <br />7. In conformance with Rule: 6.4.12(1), please provide material quantities and itemized costs for <br />the following items pertaining to the embankment stabilization: <br />volume of backfill & grading needed to reconfigure the existing pond/riverside embankment <br />surface area of synthetic filter fabric needed beneath riprap <br />volume of imported riprap ('type l.) needed <br />volume of imported riprap needed (l2" diameter) <br />cost for project supervision (registered P.E. or other yualitied person <br />cost for backfill & grading to final embankment configuration <br />cost for compaction or finish grading embankment, if necessary <br />cost for filter fabric <br />cost for importation of'Tvpe L riprap <br />cost for importation of 12" diarnctcr riprap <br />cost fur placement of l:vpc I. riprap <br />cost for placement of 1 Z" diameter riprap <br />6.4.13 F.XHI131T ~t -Other Permits and Licenses <br />8. Please clarify the status v(the applicant's mapping of jurisdictional wetlands within or <br />adjacent to the affected land, and the status of their 404 Permit application with the l'S Army <br />Corps of Engineers (COE), particularly with respect to the proposed plans for fill of several or <br />more wetlands within the permit arcu. Please affirm whether the applicant has notified the COE <br />of the proposed hank stabilization project and has suhmitted a cvpy of the propvsed stabilirativn <br />plans for their review. Also, please provide a copy of any written responses received from the <br />COE verifying whether a 4O4, Nationwide or ether COE permit is needed for any of the <br />applicant's proposed activities. Please respond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.