My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-07-06_REVISION - M1982015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982015
>
2006-07-06_REVISION - M1982015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:45:03 PM
Creation date
11/22/2007 1:13:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Revision
Doc Date
7/6/2006
Doc Name
Fax of Decision Information and 2nd Ad.
From
DMG
To
Jodi Villa
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6,4.12 FXHIBI'I' L - Keclamation ('osts <br />19. In conformance with Rule 6.4.12(11. please provide itemized costs for each spillway, <br />culvert, or other hydraulic stnicture to be installed. FULLY ADDRESSED <br />6.4.13 EXHIBIT ~1 -Other Permits and Licenses <br />2(1. Please indicate the status of the applicant's 404 Permit application with the US Army <br />Corps of Engineers, particularly witlm respect to the proposed plans la• fill of several or <br />more wetlands within the permit area. AUULfIONAL. lNFOKMATION REQUIRED - <br />SIiF SECOND AllLQI ::\Cl' RGVIE:W ITEM rtg IN MEMO FROM fOtil SCHREINER <br />21. Plcasc indicate the status of the applicant's applications to the Office of the State <br />Engineer (OSE1 tier a well permit, and a temporary substitute supply plan. FULLY <br />AUURESSF.D <br />22. Plcasc indicate time status of the applicant's application far a CLOMR with the Lrhan <br />Drainage & Flood Control District for a I(10•Year Floodplaum Revision. FULLY <br />:\UDRE:SSED <br />Plcasc refer to the detailed description of the informational reyuircments in the enclosal Second <br />Adequacy Review Comments Mcmo from Tom Schreiner. Plcasc note this memo also includes <br />new adequacy concerns not previously discussed. If you feel more time is needed to complete your <br />reply. the Dim ision can grant arm extension to the decision date. This will he done upon receipt of a <br />written waiter of your right to a decision by August 3, 200(.1 and request for additional time. 'I~his <br />must he received no later than the deadline date. <br />If you have any questions, please do not hesitate to salt me at 303-$G(i-4179. <br />Sincerely, <br />ch Go <br />8m irnnmental Protection Specialist <br />Enclosure(s): <br />Second Adeyuucy Review Comments Y1cmo..luly ~, 2011(1, Tom Schreiner <br />cc: l~y9er Packard and Brad Davis. G\RMA Highland Place II, 91 I (} E. Nichols Ave., Suite <br />H13(1, Einglewood, ('O, 801 l2 <br />Mr. Mike Siegrisl, Sicgrist C'onstructiun Company, 87~ W'. 64'x' Ave., Denver, CO 80221 <br />Tcm~ McKee, Army C"urps of Engineers -Omaha District, Denver Regulatory Office, <br />x)30? S. \Vadsworth Blvd, Littleton. ('O SU123 <br />Carl Mount; DMG (via c-mail) <br />
The URL can be used to link to this page
Your browser does not support the video tag.