Laserfiche WebLink
0 oii oiooiooiooooo oio <br />999 EXHIBIT L ( rev 11/ 84 ) <br />RECLAMATION COSTS <br />The time of greatest disturbance in the operation will be <br />near the time of completion of Stage 1 and when approximately <br />15 acres of Stage 2 is stripped. At that time Stage 1 will have <br />4.80 acres +/- in need of reclamation work and 15 acres of resoiling <br />and revegetation work in Stage 2. Final grading would be necessary <br />on the plant site in Stage 1 (15 acres +/-) and Stages X, Y, & Z. <br />Therefore, there will be approximately 42.25 acres of disturbed <br />land of which 24.93 acres will be reclaimed as industrial area <br />and would not need revegetation or resoiling and 17.32 acres +/- <br />requiring grading, shaping, respreading of soils, and revegetation. <br />a The following reclamation costs are based on 42.25 acres +/- <br />as being the maximum disturbed area at any given period during the <br />a life of the mine. <br />Financial warranty will be supplied to the Board under <br />34-32-117(3)(a)(I) C.R.S. 1983 Rev. <br />Reclamation Items, Onit Cost <br />a Revegetating.Bench Area <br />Respreading soil and/or spoil <br />(1 acre x 43560 x 1 ft)/27=1614 yds/ac x $.86/yd <br />Seeding 14.2#/ac @ $4.00 <br />(for south-facing slopes; north-facing will <br />Fertilizing 200# @ $16/100# (assumed high; <br />will depend on soil analysis and amount of <br />Labor for seed broadcasting 5 fertilizing, <br />8 hrs/ac @ $13.00/hr <br />Labor, other, 16 man hrs/ac @ $6.50/hr <br />Trees and shrubs, 200 bareroot @ $24.00/100 <br />60 potted @ $19.00/30 <br />Per Acre <br />$1,388.00 <br />56.80 <br />cost less) <br />actual <br />chip mulch) 32.00 <br />TOTAL PER ACRE TO REVEGETATE BENCH AREAS <br /> Floor and R <br />Grading and oad area <br />shaping, 4 hrs @ <br />$60.00/hr <br /> TOTAL PER ACRE TO GRADE AND SLOPE <br />a <br />a <br />a <br /> <br /> <br />Estimate off Reclamation Costs <br />Grade and shape benches - 17.32 @ $240/acre $ <br />Grade plant areas 22.32 acres @ $240.00/ac. <br />Respread soil and smooth - 17.32 ac @ $1388/acre <br />Grass seed north facing - 1.80 acres @ $32.00/acre <br />Grass seed south facing - 17.52 acres @ $56.80/acre <br />Fertilizer - 17.32 acres @ $32.00/acre <br />Labor for seed spreading - 17.32 acres @ $104.00/acre <br />Labor, tree planting and general - 17.32ac. @ $104/ac <br />Trees and shrubs - 17.32 acres @ $86.00/acre <br />Total Reclamation Costs <br />SUGGEST BOND BE SET AT $41,000.00 <br />18 <br />104.00 <br />104.00 <br />48.00 <br />38.00 <br />$1,770.80 <br />240.00 <br />240.00 <br />4,156.80 <br />5368.80 <br />24,040.16 <br />57.60 <br />969.92 <br />554.24 <br />1,801.28 <br />1,801.28 <br />$ 40,239.60 <br /> <br />