My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV103925
DRMS
>
Back File Migration
>
Revision
>
REV103925
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:14:54 AM
Creation date
11/22/2007 1:11:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
2/8/2007
Doc Name
Adequacy Review No. 2
From
J.E. Stover & Associates Inc
To
DRMS
Type & Sequence
TR44
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. J. Dudash -2- February 5, 2007 <br />BRL: Please see the enclosed report prepared by Buckhorn Geotech, dated February 1, 2007, <br />titled Geotechnical Report, Stability Evaluation of Coal Waste Pile No. 4, Delta County, <br />Colorado. <br />12. DRMS: Please provide a stability analysis [Rule 4.09.1(7)] using the material characteristics <br />requested in item number 9 above in the vicinity of cross section D - D'. The design stability <br />safety factor needs to be 1.5 [Rule 4.10.4(2)]. The configuration should be the proposed cut <br />slopes (original ground) approved by TR-43, and the proposed finished surface of the fill, as <br />illustrated for cross section D - D' on Figure 1 of the application. <br />BRL: Please see the enclosed report prepared by Buckhorn Geotech, dated February 1, 2007, <br />titled Geotechnical Report, Stability Evaluation of Coal Waste Pile No. 4, Delta County, <br />Colorado. <br />15. DRMS: Attached is the reclamation cost estimate for TR-44. The estimate is seven tasks (a <br />summary sheet and Tasks 171-176) and represents an increase in liability of $285,366.00. The <br />Division's estimate is considerably more than the estimate of $49,565.00 submitted by BRL.In <br />the submittal dated December 26, 2006, BRL stated that they accept the Division's reclamation <br />cost estimate of $265,457 for TR-44. However, the total bond amount for TR-44 is $285,366.00, <br />as shown on page two of the cost estimate. Please reconfirm <br />BRL's acceptance of the reclamation cost estimate. <br />BRL: BRL agrees with the reclamation estimate <br />21. DRMS: The Appendix B summary table on page App B-8 still needs to be revised with <br />updated ditch design information. <br />A revised Appendix B summary table page App B-8 was provided in the January 3, 2007 <br />submittal. However, as mentioned in item number one above, several revisions to the summary <br />table still are needed. <br />BRL: Please see revised attached Appendix B <br />In addition to the information referenced above, the thirteen page narrative for Volume IX is <br />enclosed. If you have any questions, please call. <br />Sincerely, <br />~~~ <br />J. E. Stover, P.E. <br />Consulting Engineer <br />Cc: USDA-FS <br />Bureau of Land Management <br />Bureau of Reclamation <br />Paonia Library <br />