Laserfiche WebLink
<br />March 27, 1995 <br />Ms. Jane[ Binns <br />Page 2 <br />Given that both SAE's drainage and sediment control designs are certified by a registered P.E. <br />and that the designs include EFCI's commitment to sampling and upgrading the drainage and <br />sediment control system if effluent levels are exceeded, a separate P.E. statement would represent <br />unnecessary duplication. <br />In addition to the noted revisions, EFCI has corrected the two typographic errors indicated in <br />Mr. Dudash's memo. Please feel free to contatt me if the department has any questions or <br />requires additional information. <br />Sincerely, <br />TerraMatrix Inc. <br />Thomas E. Leidich <br />Project Engineer <br />attachments (3) <br />cc: Al Weaver <br />J. Nettleton <br />~ ~G /f <br />