My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV103767
DRMS
>
Back File Migration
>
Revision
>
REV103767
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:14:41 AM
Creation date
11/22/2007 1:10:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978091UG
IBM Index Class Name
Revision
Doc Date
7/1/1994
Doc Name
GOLDEN WONDER MINE PN M-78-091UG RECEIPT OF 110(2) RECLAMATION PERMIT AMENDMENT APPLICATION AM-002
From
DMG
To
LAKE CITY MINES LKA INTL
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10. Primary future Cropland(CR) <br />(Post-mining) <br />land use <br />(check one): <br />Primary resent <br />land use <br />(check one): <br />Rangeland(RL) <br />Residentlai(RS) <br />Developed Water <br />Cropland(CR> <br />Rangeland(RL> <br />Residentlal(RS) <br />Developed Water <br />-3- <br />_ Pastureland(PL> <br />_ Forestry(FR) <br />Recreation<RC1 <br />Resources(WR> <br />Pastureland<PL) <br />V_ Forestry(fR) <br />Recreatlon(RC) <br />Resources<WR) <br />General Agrlcutture<GA) <br />~ Hildttfe Habltat(WL) <br />Industrial/Commerctal(IC) <br />_ Solid Waste Oisposai(WD> <br />General Agrlcutture<GA) <br />_ Wildlife Habitat(WU <br />Industrial/Commerclal(IC) <br />x Mining(MN) <br />An applicant will not be issued a reclamation permit until notified by the Division that <br />this application and the required performance and financial warranties have been <br />approved. Alternatively, an automatic approval will occur where the blvision fails to <br />notify the applicant/operator that the application has been dented. This decision must <br />be made thirty (30) calendar days from the date the appilcatlon was submitted. However, <br />the performance and financial warrantees must be submitted and approved by the Division <br />before the permit will be issued even 1f you receive an automatic approval. NO MINING <br />OPERATION5 SHALL BEGIN UNTIL A PERMIT I5 ISSUED (Rule 7.2(2)). <br />It shall be a provision of this permit that the operations will be conducted in <br />accordance with the terms and conditions listed 1n your application, as watt as with the <br />provisions of the Act and the Minerai Rules and Regulations in effect at the time the <br />permit is Issued. <br />Notice ReQUirements <br />Within ten (10) days after filing, mall or personally serve a copy of the notice <br />described 1n Rute 3.2(3)(b)(tit) to to alt owners of record of surface rights to the <br />affected land and all owners of record of lands that are within 200 feet of the boundary <br />of the affected land (Rule 3.2(3)(b><1v)(A) and (B)). In addition, you should publish <br />once in a newspaper of general circulation, in the locality of the proposed mining <br />operation, the notice described fn Rule 3.2<3)<b)(111>. A copy of a form which includes <br />all required information for the notice has been attached for your use. You will need <br />to provide the Division proof of notice prior to the decision date. Proof of notice may <br />be by submitting return receipts of a certified mailing or by proof of personal service <br />(Rule 3.2(3>(b)(vi)). <br />NOTE TO COMMENTORS/OBJECi0R5: It is ilkely there will be additions, changes, and <br />deletions to this document prior to final decision by the Division. Therefore, 1f you <br />have any comments or concerns you should contact the applicant or the Division prior to <br />the decision date so that you will know what changes may have been made to the <br />appllcatlon document. <br />The Division is not allowed to consider comments, unless they are written, and received <br />prior to the end of the public comment period. You should contact the applicant for the <br />final date of the public comment period. <br />If you have questions about the Mined Land Reclamation Board and Dlvtslon'S review and <br />decision or appeals process, you should contact the Division at (303) 866-3567. <br />
The URL can be used to link to this page
Your browser does not support the video tag.