Doc Name
INTEROFFICE MEMO TR-43 COST ESTIMATE FINDINGS C-81-019
From
DMG
To
FILE
Type & Sequence
TR43
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Interoffice Memorandum <br />Walker to File <br />Mazch 24, 1998 <br />Page 3 of 3 <br />Excavation of 3,800,000 cubic yazds of material from the end walls of the East and West Pits for <br />drainage cuts was reduced to 300,000 cubic yazds. The 300,000 cubic yards of drainage cut is <br />associated entirely with the West Pit. The East Pit will engage a natural drainage. <br />A detailed comparison can be accomplished by reassigning work elements of the cost estimates. <br />Reductions in earthwork costs are the most significant. In general, the estimated total <br />reclamation liability following approval of TR 37 was $19,567,807, of which $14,427,261' was <br />for earthwork. The total liability cost estimate was increased to $19,581,899 during the time <br />between TR 37 was approved and TR 43 was submitted. The total liability cost estimate <br />developed by TR 43 is $15,670,521, of which $ 11,154,984= is for earthwork associated with the <br />current reclamation plan. <br />Although some increases in the costs of certain line items such as vegetative maintenance, <br />facilities demolitions (inflation), etc., are demonstrated in the revised estimate, reductions other <br />than earthwork reduce the estimate by $639,101. This $639,101 is composed of items such as <br />reductions in subcontractor indirect costs ($2,363,(16 to $1,935,105), administrative indirect <br />costs ($563,394 to $466, f 23), and a $62,073 unspecified increase to the previous estimate as a <br />result of negotiations with the Division. <br />~ Table 4, Revised August 5, 1996, TR 37, Total All Direct Costs minus Facilities Removal minus Pond <br />Maintenance minus Other CMLRD Stipulated Costs. <br />~ Table 2, Revised March 3, 1998, TR 43, Subtotal All Direct Costs minus Facilities Removal. <br />