My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV103690
DRMS
>
Back File Migration
>
Revision
>
REV103690
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:14:35 AM
Creation date
11/22/2007 1:09:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
6/7/1996
Doc Name
Midterm Review Findings Document
Type & Sequence
MT3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,- <br />Mid-Term Review <br />Sanborn Creek Mine, Permit No. C-81-022 <br />This document presents the results of the Division's mid-term <br />review for the Sanborn Creek Mine. This review was conducted to <br />fulfill the requirements of Rules 2.08.3, 2.06.2(9), 2.06.3(4), <br />2.06.5(3), 2.06.7(5) and 3.02.2(4). <br />Rule 2.08.3 requires that the Division conduct a review of each <br />permit issued prior to its mid-term. Based on this review, for <br />good cause shown, the Division may require reasonable revision or <br />modification of the permit provisions to ensure compliance with the <br />Act and Regulations. <br />Rules 2.06.2, 2.06.3, 2.06.5 and 2.06.7 require that experimental <br />practices, mountaintop removal variances, variances from AOC, and <br />variances from contemporaneous reclamation be reviewed by the <br />Division where applicable. The Sanborn Creek Mine does conduct <br />operations under one of these categories as discussed in section V <br />of this document. <br />Rule 3.02(4) requires that the Division review the amount of the <br />bond and the terms of acceptance of the bond every 2 1/2 years. <br />This is covered in Section III on this document. <br />The review consisted of a review of all previous findings documents <br />associated with the mine, all previous mid-term reviews, annual <br />reclamation reports, revisions, stipulations, phased bond releases <br />and the annual hydrology reports. In addition to this, the field <br />inspection reports were reviewed. <br />The document is organized as follows: Section I includes a brief <br />history of the mine. Section II includes a summary of any changes <br />or revisions that need to be made to the permit and the <br />justification for those changes. Section III summarizes any <br />revisions to the permit since the last renewal and lists any <br />stipulations and responses since renewal. Section IV discusses the <br />current state of the bond liability and reclamation bond for the <br />Sanborn Creek Mine. And finally, section v discusses variances <br />from approximate original contour. <br />I. History <br />The Sanborn Creek Mine is owned and operated by Oxbow Carbon and <br />Minerals, Inc. The mine is located within the drainage of the <br />North Fork of the Gunnison River and sits just north and adjacent <br />to the town of Somerset, Colorado. The permit area encompasses <br />land in both Delta and Gunnison Counties. <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.