Laserfiche WebLink
~~ - ~Ms.Kate Pickford <br />~_ Division OJMinerals and Geology <br />November 14, 2003 <br />Page 2 oj2 <br />The erosion protection material will be placed along the channel bottom from five feet belovv the <br />anticipated normal lake elevation- to the existing channel near the property boundary. The . <br />material will also cover the adjacent slopes a minimum of 4 feet above the channel bottom. <br />Kate, if you have, any questions regarding these. responses, or have additional comxrtents <br />concerning the proposed activities, please do not hesitate to call me at (970) 461-9884 ext. 208. - . <br />Sincerely, <br />' Applegate Grqup, inc. <br />William Schenderlein <br />Project Engineer <br />cc: AG File No. 03'-141 <br />John Briggs, City of Greeley w/o enclosures <br />Connie Davis, Aggregate Industries w/o. enclosures <br />. 1 <br />