My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV103638
DRMS
>
Back File Migration
>
Revision
>
REV103638
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:14:31 AM
Creation date
11/22/2007 1:08:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987097
IBM Index Class Name
Revision
Doc Name
HIGH & DRY 110 2 BORROW & GRAVEL
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />•~ . ` <br />II <br /> <br />i <br />• <br />•~--1.30' ~~~ <br />-15 ft. or 5 yd. per side due to sloping = 200 yd. per side <br />x 4 sides = 800 yd2 <br />x 6.25 yd3 5,000 yd3 <br />of fill material <br />Cut banks from iH-1V to 2H-1V <br />Tota'! Material 5,000 yd3 <br />Area Disttince ~ 58 ft. <br />Reclamation Costs <br />Cost to Push Topsoil 175 ft. <br />7,260 yd3 x .675 yd3 = 85,513.22 <br />Cost to Push Overburden 58 ft. <br />5,000 yd3 x .233 yd3 = 51,165.00 <br />Seed 10 acres @ 8500.00 /acre 55,000.00 <br />Mobilization 200/hr for 1 Dozer <br />and Seeding Eq. = 3 800.00 <br />Subtotal = 512,478.22 <br />+ 15.fiX Overhead = 51,471.56 <br />TOTAL = 514,450.00 <br />Cost Fier Acre on 10 Acre Site 51,445.00 <br />GRS/ern <br />(5/92) 3226E <br />... <br />
The URL can be used to link to this page
Your browser does not support the video tag.