Laserfiche WebLink
~ <br />~ <br />United States Department of the Interior .~~ <br />Bureau of Land Management TAKE. <br />Kremmling Field Office ~N/~MERICA <br />2103 E. Park Ave. <br />PO Box 68 <br />Kremmling, CO 80459-0068 <br />970-724-3000 <br />httolhvww.co.bhn. _~ovrkra~kraindes.hmi In Reply Refer To: <br /> 3400 <br /> (CO-120) <br />March 10, 2004 <br />Mr. George Patterson <br />Energy Fuels Coal, Inc. <br />Southfield Mine <br />PO Box 459 <br />Florence, CO 81226 <br />Deaz Mr. Patterson: <br />REC~~`~~~. <br />MAR 1 1 2004 <br />DirisimefMinera4. ,,,;~ ,,. <br />This letter follows your correspondence of 2/26/04, concerning reclamation of Pond G at the old <br />Kerr minesite in Jackson County. Your request of a two-yeaz delay in the reclamation of this <br />pond is acceptable to the Kremmling Field Office of the BLM. In fact, a brief delay is welcome, <br />as this office feels that natural revegetation may have been effective enough so that only minimal <br />work may be needed to remove the dam and dike for this pond, with little other disturbance <br />required or desired. Our staff will field check this site during the summer of 2004. We will also <br />review the site for retention of the road and culvert in Bush Draw this summer. <br />We plan to report back to you and the State of Colorado Division of Minerals and Geology <br />(CDMG) on our findings of the condition of natural revegetation and any reclamation work that <br />may be required at Pond G. The road status will also be addressed in this same report. This <br />response will likely occur after the 2004 field season. <br />Please contact Mr. John Morrone of this office at 970-870-6132 or 970-724-3015 with any <br />questions or for any clarification. <br />Sincerely, <br />ohn . Ruhs <br />Field er <br />cc: Sandy Brown-CDMG <br />